Facade works finishing.
Roofing and facade work.
Facade work- 25% readiness.
Perfect for facade work.
Facade works on section G.
Performed facade works- 90%.
Facade work on the 8th floor.
Various roofing and facade work;
The facade works are continuing up to the 6th floor.
The cottage№1,2- the facade work is conducted.
Facade works, including banners and advertising installation.
Reinforcement during plastering and facade works;
Cottages№3,4- maintained facade work, cottage 4 plastered.
The facade works at the level of the 1st floor are at the stage of completion.
Installation of windows on floors 1-2 and facade works on 2 level.
Facade work continues in two houses of the Metropolis apartment complex(video).
For painting walls, ceilings or facade work more convenient to use cans.
The same compositionswill be optimal for unheated premises or for facade work.
Therefore, it is chosen for facade work, when the walls and tools are under strong pressure.
Facade work: facing from aluminum composite panels and fiber cement board is made on 97%.
It is worth noting one thing:there is now a kind of panels used in the facade work.
Facade work: facing from aluminum composite panels and installation of HPL panels made by 99%.
Such a coating is most often used for facade work and painting the exterior contour of a building.
For facade work or applying stylish graffiti, it is preferable to select phosphorescent products in powder form.
Sell Construction mast lifts to move goods and people,as well as elevating work platforms for facade work.
Fluorescent paint used for facade work, has excellent resistance to various atmospheric factors.
It is used as a reinforcing element in the painting works, both for domestic and for facade work in the heating systems.
Cottages№1,2- facade work completed 70%, conducted internal finishing works, installed Windows.
Facade work: the installation of brackets, frame and heater from the 2nd to the 6th floor is completed, finishing works for the installation of clinker tiles(90%) are underway.
During the second half of 2019, facade work was partially done and the construction of an underground passage that connects the shopping center with the metro transfer station was completed.