Voorbeelden van het gebruik van Large span in het Engels en hun vertalingen in het Nederlands
{-}
-
Official
-
Colloquial
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
Large span lengths via efficient structures.
The aluminum tents are long with large span.
Large spans and cantilevers are possible.
Light weight, high strength, large span;
Large span steel structure factory, warehouse.
Industrial plants, hanger, large span halls….
Large spans possible thanks to efficient profile use.
Suitable for linear axis portals with large span widths.
Even large spans can be accommodated without a problem.
continuous rigid frame: large span.
During large spans the bus makes a technical stop every 4 hours.
A truss construction is usually chosen for large spans.
This gutter has a large span measuring up to six metres.
Its design concept blends broken bridge insulation and large span.
Large spans give tenants flexibility in how they sub-divided the space.
That allows for an enormous freedom in shapes and a large span without columns.
Their large spans and rotation make them a preferred point of impact for lightning strikes.
Due to the high load-bearing capacity, light constructions with large spans are possible.
Large span give you a modern feeling,
Pultruded grating is suitable for applications with a large span and a high load.
These profiles have a large span and the accuracy of movement and speed are extremely high.
Roof construction Large buildings require roof construction with large spans.
Large span: The largest span of Tension membrane structures can exceed to 200m.
Bridges and other structures with a large span are often designed as pre-stressed concrete constructions.
The first being a generally double height circulation zone for the building, with large span ribbed floors.
While the large span and heavy duty load capacity that it will choose composite light steel structure.
Use: Used for 6 bundled conductor stringing to prevent theconductor from twisting under strong wind and large span between sub-conductors.
So you get a very large span of this scene for you to chew,
low deflection of the linear units even with a large span.
On the Vlietzone side, the large span over the motorway will be transformed into a small-scale series of spans along the Van Lochem building and the Leeuwenbergh golf course.