Примеры использования Air purge на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Select Start air purge and press.
Air purge gun with extension cord.
To perform an air purge on the brine circuit.
Air purge gun with extension 5 pcs.
Press and press to confirm the air purge function.
The air purge valve is open at least 2 turns.
It is recommended to start the air purge function in manually mode.
See the air purge function in the"Commissioning" chapter.
After the piping has been connected to the indoor unit,perform the air purge.
Air purge flow heated by an external electric heater.
The space heating air purge valve is open at least 2 turns.
When the refrigerant piping connection is complete, check the air purge and gas leakage.
Install air purge valves at all local high points.
Set the desired position of the 3-way valve: go to[A.7.3.3]> Installer settings>Commissioning> Air purge> Circuit.
The air purge function stops automatically after 30 minutes.
For instructions on how to perform an air purge, refer to"9.4.2 Air purge function" on page 75.
Execute air purge of the pipe(or hose) coming from refrigerant gas cylinder.
Gas pipe connection b Liquid pipe connection c Pressure gauge d Safety valve e Water circuit drain valve f Air purge g Shut‑off valve with fill valve(accessory) h Water filter i Water IN connection j Water OUT connection k.
Perform air purge of the pipe(or hose) coming from refrigerant gas cylinder.
As good as TC-based CO2 sensors are, their performance relies on two main aspects:the reliability of the air purge supply they require for their operation, and the integrity of the CO2-permeable membrane that separates the TC chip from the beer.
Execute air purge of the pipe(or hose) coming from refrigerant gas cylinder.
Holes(Ø12 mm) for wall fixaxtion b Water outlet connection(1‑1/4" F BSP) c Water inlet connection(1‑1/4" F BSP)d Refrigerant liquid connection Ø9.52 mm flare connection e Refrigerant suction connection Ø15.9 mm flare connection f Pump g User interface h Safety valve pressure i Air purge j Expansion vessel k.
Air purge must be performed for both the space heating and the domestic hot water circuit.
For both manual and automatic air purge, 1 temperature zone is purged with each air purge start.
Air purge function on the brine circuit When installing and commissioning the unit, it is very important to remove all air from the brine circuit.
Its compact form factor provides front window protection with air purge to avoid costly repair or replacement of the lens; and to allow permanent use in dust-loaded atmospheres.
Air purge function on the space heating circuit When commissioning and installing the unit, it is very important to remove all air in the water circuit.
For location of the air purge valve, see"14.2.1 Components: Indoor unit" on page 67.
To perform an air purge with a brine filling station Follow the instructions included with the brine filling station field supply.
For instructions on how to perform an air purge, refer to the"Commissioning" chapter of the installation manual of the outdoor unit.