Примеры использования Generating equipment на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Oxygen Generating Equipment.
Implementation of modernization measures for generating equipment.
Generating equipment of UES of Russia with a total capacity of 2,357.3 MW was decommissioned.
The project provides for complete replacement of the generating equipment.
Criteria for selecting power generating equipment, innovative technologies implementation, energy-efficient solutions.
Implementation deadline of modernization measures for generating equipment.
Generating equipment of power plants of UES of Russia with the aggregate capacity of 1,435.4 MW was decommissioned.
YDGETis aChinese leader in designing and manufacturing Nitrogen Generating Equipment.
The decision on the decommissioning of existing generating equipment is based on the analysis of the following factors.
They should not be stored near electric motors or other ozone generating equipment.
Thus, electricity producers cannot change the load of the generating equipment at their own discretion and deviate from the approved schedules.
These same countries will probably have widespread applications of radioactive materials and radiation generating equipment.
The increased installed capacity of the operating generating equipment due to remarking reached 292.1 MW.
ÚAM Brno focuses mainly of dealing with operational problems occurring in energy generating equipment.
It is extremely important to reduce the wear degree of generating equipment and increase the electric power reserve.
Establishment of energy efficient operations of buildings, dwelling houses,central heating systems and energy generating equipment;
Commissioning of generating facilities Optimizing the generating equipment load in the conditions of output reduction at low-margin power plants;
The unique character of this project manifests itself in the fact that all of the operations were conducted while the generating equipment was in operation.
Decline in the growth of grid and generating equipment saving an increase in the installed capacity of power plants 3-5% by reducing the required power reserve since 2014.
This option does not imply an increased load on the consumer, andat the same time the service life is extended for a large amount of the generating equipment.
KAN PSA nitrogen generating equipment use the high quality carbon molecular sieve as adsorbent, and utilize PSA principle, acquiring nitrogen gas from compressed air directly.
The 2009 introduction of cap rates provided EPO Group of Companies with an adequate mechanism for implementing long-term investment projects to modernize the generating equipment.
KNA PSA nitrogen generating equipment use the high quality carbon molecular sieve as adsorbent, and utilize PSA principle, acquiring nitrogen gas from compressed air directly.
Under existing contracts, a lot of work was done to equip,upgrade and maintain the generating equipment of both existing power plants and plants under consrtuction in Russia and abroad.
Installation of the new generating equipment at the Iovskaya HPP of the Niva HPPs Cascade of TGC-1 is completed, and commissioning of the second hydro generating unit and adjustment of all hydro station systems began.
The principal activities of the Company in 2011 were the production and sale of electricity andpower generated based on in-house generating equipment, export-import of electricity, as well as investing activities.
Inthe Orel region the work tocommission new generating equipment ofLivenskaya GTCHP isunder completion, the grid connection ofwhich isbeing performed byIDGC ofCentre- Orelenergo division.
Current market needs, increasing prices for energy sources,explosive development of renewable energy sources abroad pushed us towards re-orienting the company from energy saving materials to energy generating equipment and energy saving technologies.
Resulting from activities aimed at remarking of the generating equipment, the total capacity of efficient generating units of Kaliningradskaya TPP, Urengoyskaya TPP, Yuzhnouralskaya TPP-2 increased by 69.2 MW.
To ensure reproducible measurement results are obtained when tests and measurements are repeated, the test signal generating equipment and its layout shall be to the same specification as that used during each appropriate calibration phase.