Примеры использования Main electric на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Main electric panel located in engine room.
Wheelhouse Utilities- main electric panel located in the crew room: 24V.
Main electric elements are Siemens/Schneider.
Tank drainage with automatic control or via the switch on the main electric panel.
Main electric panel located in crew cabin and engine room.
The air blower house is the main electric consumer at the wastewater treatment facilities.
Main electric panel located in crew cabin and engine room.
The AC power sources are controlled from the main electric panel, with a digital multimeter for the 230V network.
The main electric panels are installed in: crew room astern.
Branch of JSC«FGC UES»- the Sredne-Volzhskoye enterprise of the main electric networks 433100, the Ulyanovsk region, rs.
The main electric panels are installed in the crew cabin(main panel) and dinette.
Within 2005 the total number of technological infringements in work of the main electric networks equaled 1076 cases compared to 1086 cases in 2004.
Inverter and Main electric elements are Siemens/Schneider or equal brand.
The created branches of JSC« FGC UES»- SR MEN have regional divisions in structure- the enterprises on servicing and repair(ESR) of the main electric networks.
In the Main electric networks(TG) in 2005 there were 4 accidents, they are heavy.
For this purpose within a personnel aggregate number seven new branches on maintenance service and repair of the main electric networks(MSR MGC) with regional TMSR was created.
In work of the main electric frids(MEG) in 2006 the general number of technological infringements made 1282 cases against 1141 in 2005.
There was an allocation of functions of maintenance service and repair of the main electric networks therefore seven new branches were created on maintenance service and repair TMR IPN.
Given that the main electric power consumers are industrial facilities, the state allocated special industrial zones for them.
Control panels of both units are situated at one location. Control of common equipment work, the main electric scheme and coordination of work of units is realized from central control panel situated on БЩУ№ 1 and№ 2.
In 2006|Management of the Federal network company took steps, directed on transformation of JSC« FGC UES» to the operating company andpreparation of transition for competitive attitudes in sphere of operation of the main electric networks.
The pump control is located in the main electric panel, in the main helm, on the fly and on starboard side of the supertructure area.
Existing branches MGC and PMGC transferred all personnel on maintenance service and repair to branches ToiR MES and carry out operative service of substations andfunction of the customer on maintenance service and repair of the main electric networks.
Diameter of milled wheel 1000mm main electric motor 7.5kW, machine dimensions(length x width x height) 3120x1870x2525mm, machine weight 8700kg.
Product adopts the new type of circuit breaker operating mechanism, a VSG primary part can adopt international brand embedded poles,the vacuum interrupter and main electric circuit parts enclosed into a whole, protect the vacuum interrupter is affected by collision, dust and condensation, environment adaptable, greatly reduces the operation maintenance cost, realize the primary part of product for free maintenance, operation mechanism for less maintenance;
The AC power sources terminate on the main electric panel in the engine room, for the 230 V network. The AC power sources are protected by suitably sized fuses, and introduced into the network by means of remote control switches.
The AC power sources terminate on the main electric panel in the engine room with a voltmeter and ammeter for the 220 V power supply.
The AC power sources are controlled from the main electric panel in the auxiliary room, with a voltmeter and frequency meter for the 220V network.
Much attention was paid to the water-& dirt-guard system:Amal carburettor and main electric components were under a cover, an air filter inlet was located relatively high so the machine could pass through the shallow of the river up to 0.5 m of depth.
Affording double glazing/mosquito nets, gas central heating, 2 x water deposito, mains electric and to the left of the property is the additional plot that is distributed over 2 graduated levels each level is flat and usable.