Примеры использования Monthly cost estimate на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
June 1995 and monthly cost estimate.
Monthly cost estimate after 31 Oct. 1994.
Monthly cost estimate after 30 June 1995.
In addition, the Secretary-General's report includes a monthly cost estimate of $21,182,900 gross($20,849,900 net) for the period beyond 29 February 1996.
Monthly cost estimates are based on 30 days.
Funds were obligated at the beginning of the reporting period for the Integrated Management Information System(IMIS)based on the monthly cost estimates contained in annex V to document A/49/540.
And monthly cost estimate for the period after 30 June 1995.
Moreover, when the cost estimates for the mission were at maintenance level,annex III C should only provide the total annual resource requirements and the corresponding monthly cost estimates.
Monthly cost estimate for the period after 31 October 1994.
This amount is $8,572,600 gross($8,017,800 net)lower than the pro-rated monthly cost estimate for the period from 1 October 1994 to 31 March 1995 as contained in annex III to document A/48/850/Add.1.
Monthly cost estimates after initial three-month expansion.
Upon inquiry, the Committee was informed that in view of the recent deployment of the medical unit from the Republic of Korea, the value of the related contingent-owned equipment has not yet been determined andtherefore no provision for the reimbursement for the equipment was made in the monthly cost estimates.
Monthly cost estimate for the period after 30 june 1995. 24- 25 9.
With regard to the estimates for rations, the Committee was informed, on inquiry, that the requirements should have been based on an average cost of $9.50 per person per day, rather than on $11 as indicated in paragraph 10 of annex IV;this correction would result in a decrease of $9,100 in the monthly cost estimates of $3.2 million gross.
June 1995 and monthly cost estimate for the period after 30 June 1995.
The Committee was informed, upon inquiry, that the report erroneously showed the negative estimate of $161,600 in the first column of annex III; the first and the second lines of the initial cost estimates under budget line 6(a), Helicopter operations, should read $602,800 and $158,300, respectively;this correction has no impact on the monthly cost estimates.
The monthly cost estimate for the period after 31 October 1994 is based on the parameters provided below.
The Secretary-General's report(A/49/375) contained the cost estimate for the period from 5 April to 9 December 1994 and monthly cost estimates for a 12-month period, beginning on 10 December, which would ensure the operation of the Mission in the event that the Council decided to extend its mandate, as well as information on humanitarian assistance, voluntary contributions, status of reimbursement to troop-contributing States and the Secretary-General's observations and comments on previous recommendations by the Advisory Committee on Administrative and Budgetary Questions ACABQ.
The monthly cost estimate of the Mission for the period after 30 June 1995 amounts to $5,619,400 gross $5,123,000 net.
The monthly cost estimate is based on similar contracts previously awarded for other peace-keeping operations $750,000.
The monthly cost estimates of $208,600(including fuel and insurance) are based on an estimated flying time of 120 hours per month.
The monthly cost estimates for the period after 30 November 1994, as reflected in annex III of the report, do not contain a provision for the acquisition of vehicles.
The monthly cost estimate for the maintenance of MINURSO, based on its current strength and mandate for the period after 30 November 1994, amounts to $3,245,100 gross $3,013,800 net.
A summary of the monthly cost estimate for the maintenance of UNOSOM II after 31 October 1994 is shown in column 4 of annex V, and supplementary information thereon is presented in annex VII. The civilian staff and related costs for the period after 31 October 1994 are shown in annex XI.
The monthly cost estimate for the maintenance of UNOSOM II for the period after 31 October 1994 is based on the average troop strength of 15,000, all ranks, and amounts to $58,513,300 gross($57,678,600 net), inclusive of an additional provision of $10 million for the reimbursement of the cost of contingent-owned equipment to the troop-contributing Governments.
The Committee notes from paragraph 15 of the report that the monthly cost estimates of $3.2 million gross are based on the actual strength of the Mission of 153 internationally and 63 locally recruited staff as at 1 October 1994, rather than on the authorized staffing table and that, should an increase in staff resources over the current number now on board be required in the implementation of the MINURSO mandate, additional funding would be sought from the General Assembly.
The cost estimate provides for a monthly total requirement of 100 hours per helicopter at an average fuel usage of 750 litres per hour, at a fuelcost of $0.55 per litre $1,485,000.
For the period 14 April-31 December 1995, the cost estimate was approximately $12.2 million gross or an average monthly cost of $1.4 million gross.
Estimated monthly cost.