Примеры использования Pilot basins на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Pilot basins are formally accepted by July 2012;
The project would focus on two pilot basins.
The pilot basins were selected and confirmed during the inception phase, as follows.
Format should be consistent across the pilot basins.
Like in other pilot basins of the project, 21 groundwater samples were collected for analyses of main cations and anions, and trace elements.
Result 2- RBMPs are developed for all pilot basins.
The Working Group decided that it would focus on two pilot basins in EECCA and requested the proposal to be presented at the fifth session of the Meeting of the Parties ECE/MP. WAT/WG.2/2009/2, paras. 64- 69.
The Objectives and goals of the Communication Strategies for Pilot Basins.
It is important to know what are the existing bodies, structures,institutions in the pilot basins where these exist and are used currently or could be used for public participation in the future e.g.
Leaflets will be published within the project about its activities andresults including in the pilot basins;
On 6-27 April, 2013 joint groundwater field survey and training was performed in the pilot basins of Caucasus countries of Armenia, Georgia and Azerbaijan.
OBJECTIVES OF GROUNDWATER MONITORING Groundwater monitoring programmes shall be designed for the delineated groundwater bodies in the pilot basins.
All delineated groundwater bodies in both pilot basins are of good quantitative and chemical status, although Quaternary aquifers in the Prut valley are heavily impacted by unofficial and chaotic gravel extraction.
Task 1.3.1: WFD-compliant monitoring programmes designed for the pilot basins Sep 2012- Sep 2013.
It is important to know what are the existing bodies, structures,institutions in the pilot basins where these exist and are used currently or could be used for public participation in the future e.g. RBCs, working groups, committees, etc.
International Conventions covering in their scope activities which may directly orindirectly affect the pilot basins if ratified by the country.
In order to coordinate better the implementation of the Communication Strategies and Plans in the pilot basins, a Communication Committee(CC) is suggested to be established consisting of the country water management experts(CWMs) and the Project Director or Team Leader PD/TL.
The presenters described the objectives, coverage andmethodologies of the Joint Field Surveys undertaken in the pilot basins in June to September 2013.
Since the main objective of the project is to develop and implement RBMPs for the selected river basins according to the requirements of the WFD(2000/60/EC), the requirements for access to information and public involvement of WFD are taken into account in the firstplace when developing and implementing the Communication Strategies and Plans for the Pilot Basins.
Therefore the overall goals of the Communication Strategies for the Pilot Basins should include the following.
To ensure proper communication, access to information, stakeholder and public involvement in the development andimplementation of the RBMPs in the project countries in the pilot basins;
In order to ensure consistency among the Communication Strategies andPlans for the above mentioned pilot basins, the following methodology has been undertaken.
During the implementation of the project, the communication should target the identified specific stakeholders andthe general public in the pilot basins.
Based on a grant from the French Global Environment Facility to the International Water Assessment Centre(IWAC), the project is implemented by the International Office for Water andIWAC in two transboundary pilot basins: on the Aral Sea Basin, in collaboration with the Executive Committee of the International Fund for Saving the Aral Sea(EC-IFAS); and on the Dniester River Basin. .
The key audience andstakeholders who need to be addressed by the Communication Strategies in the pilot basins should include three basic target groups.
In Part II of the Communication Strategy it is indicated what public participation opportunities are proposed related to the different project activities in the pilot basins, when and who will be responsible for ensuring them.
This catalogue would be hosted on a server at IWAC and would constitute a single point of entry for identifying all orpart of the data described in the pilot basins' metadata catalogues, plus other national or regional catalogues;
The representative of IWAC presented progress on the project,"Strengthening capacity for data administration and exchange for monitoring and assessment of transboundary water resources in Eastern Europe, the Caucasus and Central Asia", which was being implemented in the Dniester andAral Sea pilot basins and which involved looking at what information was available for which actors in the basins. .
The dialogue process focused on(a) the implementation of the river basin management approach through development of a RBMP for the Chu River;(b)setting targets and target dates at national level in the context of the Protocol on Water and Health(on the basis of a preliminary study implemented in two pilot basins-- the Chu River Basin and the Issyk-Kul Basin); and(c) the use of economic instruments for water resources management.
The dialogue process focuses on(a) the implementation of a river basin management approach through the development of the river basin management plan for the Chu River;(b)setting targets and target dates at the national level in the context of the Protocol on Water and Health(on the basis of preliminary study implemented in two pilot basins-- the Chu River Basin and the Issyk-Kul Basin); and(c) improving economic instruments for water resource management in the Issyk-Kul Basin.