Примеры использования Total depth на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The total depth with this version is 130mm.
The well was drilled to a total depth of 3,085m.
The total depth will not be reached before August 2012.
The shallow well 143 was drilled to total depth of 2,750 meters.
The total depth of the enemy defense reached 13-15 kilometers.
With flow control damper OD total depth is 35 mm+ 45 mm.
Total depth of stern platform: 1700mm(lifting platform+ fixed part).
The company plans to drill the next deep well A6 to a total depth below 4,437m.
If successful, the total depth would be reached in August 2012.
On January 25, Jupiter Energy announced that J-53 well reached its total depth of 3,113m.
The well reached a total depth of 1,334m"without encountering producing hydrocarbons" and will be plugged and abandoned.
Also, the ESKN-2 appraisal well will be drilled to a total depth of about 1,400m.
AKD08 well(Doto) reached a total depth of 1,368m and in seventy days the company expects the well to reach a target depth of 3,500m.
Jupiter's fourth commitment well(J-53) reached its total depth of 3,113m earlier this year.
At the same time, the company commenced drilling the next appraisal well UTS-12 to a total depth of 450m.
SAGW-14 and UTS-9 will be drilled to a total depth of 1,400m and 550m, respectively.
The sidetrack of Dzheitune(Lam) B/155A well was completed in February with a total depth of 2,447m.
Condor Petroleum's second appraisal well, Shoba-9,also reached a total depth of 843m in May with 3m of net oil pay within the Triassic.
Tethys said that Kalypso(KBD01)exploration in Kazakhstan well has almost reached the total depth of 4,300m.
The width of damaged tissue along the sample surface was 1,503 μm, total depth of exposure area was 399 μm, coagulation zone being from 177 to 239 μm See the Figure c.
Another deep well 801 is due to be spudded on December 15, 2014 and is to be drilled to a total depth of 4,700 meters.
The Dzheitune(Lam) C/183 well was completed in August with a total depth of 2,758m, whereas Dzheitune(Lam) C/184 was completed in September with a total depth of 2,900m.
Today, Jupiter Energy announced that after 50 days of drilling J-51 well on Block 31 reached a total depth of 3,100m.
A post-salt exploration well, KNC-3,was drilled to a total depth of 1,130 meters in August 2014.
Yesterday, Max Petroleum announced that the SAGW-4 appraisal well in the Sagiz West field reached a total depth of 1,558m.
At the end of reporting period production well 19 reached a total depth of 1,628m out of the 3,350 planned.
Tethys also said it continues drilling Persea exploration well,which is estimated to reach its total depth in next month.
An interesting solution for the kitchen is also the planning, according to which the total depth of the kitchen is 90 cm, and the working depth is 60 cm.
Yesterday, Max Petroleum announced that its first exploration well BCHW-1 in the Baichonas West prospect reached a total depth of 1,430m.
On October 1, Max Petroleum announced that SAGW-6 appraisal well in the Sagiz West field reached a total depth of 1,453m, with electric logs indicating a 30m net oil pay.