Примеры использования Value is calculated на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Its value is calculated as part of block execution.
If a document contains less than 1800 characters, its value is calculated as per 1 add-ons page.
The return value is calculated directly in the parentheses of the operator return.
As values of all peak areas are defined, the activity value is calculated by each line.
Fair value is calculated basing on market prices, discounted cash flow models.
Assuming that tests are done with the same vehicle under the same general test conditions,the standstill value is calculated with the following formula.
Its value is calculated, and the function returns the string"YES" if the calculated value is a timestamp.
The settlement local government needs to order an investigation of the family's assets, which may not exceed a pre-set value, separately or taken together. This value is calculated as follows.
Updated the way the CONTROL value is calculated to better represent the amount of recoil that players have to compensate for.
Personal goodwill, as a rule, is linked to the person of the head of the company, is not transferred when it is sold andconsequently is not taken into account when its value is calculated, except in cases where, after a change of company ownership, the same person continues to head it.
The value is calculated from the time the load begins to rise until the first occurrence of 0 load after the maximum point.
He notes that the 1991 legislation obliges the State to pay compensation in the form of vouchers, whose value is calculated by reference to an(arbitrarily chosen) amount per square metre of the building.
Currently, its value is calculated by the formula as part of the crowdsale stages according to the Bit bon System White Paper.
Debt buy-backs involve buying back the claims at the net present value ofthe remaining cash flows; the net present value is calculated by discounting cash flows at risk-free rate plus a market-referenced common country-risk spread.
This value is calculated at costs prevalent in India and would be much higher if calculated at international prices.
A method where the value is calculated from the engine operating conditions(speed, torque) obtained by the HILS simulated running.
Its value is calculated, and the function returns the string"YES" if the calculated value is a string, representing a name of hierarchical Mailbox.
Methods that are technically valid,such as a method where the value is calculated from the operating conditions of the hybrid system(revolution speed, shaft torque) obtained by the actual hybrid powertrain test, using the input/output voltage and current to/from the electric machine(high power) electronic controller, or a method where the value is calculated by using the data such acquired pursuant the component test procedures in paragraph A.9.8.
The value is calculated as the total value of construction contracts to be completed in the future, net of revenue already recognized on such contracts.
Its boolean value is calculated, and the value is positive(true), the function returns the string"YES", otherwise it returns the string"NO".
Moreover this value is calculated in each ROI independently(by summation of the corresponding elements in the ROI), so the model quality is analyzed in more details.
Its value is calculated, and the function returns the string"YES" if the calculated value is a string, representing a name of hierarchical Mailbox. Otherwise the function returns a null-value.
This value is calculated by updating the value of the pension point recorded in each December, with at least the inflation rate foreseen for the next budgetary year.
Such value is calculated as the total contract value for each project that remains to be completed less the amounts already received under the contracts for such projects.
Its value is calculated, and the function returns the string"NO" if the calculated value is not a null-value, or the string"YES" if the returned value is a null-value.
Note: Amortized cost and fair value are calculated using the effective interest rate method.
These equivalized values are calculated using the equivalence scales.
The values are calculated as follows.
Root mean square deviation value in different measurable values was calculated as follows.
NOTE: These values are calculated based on a 6.25 mm/year corrosion rate.