Приклади вживання Layer of gravel Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Next- a layer of gravel, 5-8 cm thick.
Containers are installed in the trench with a layer of gravel on the bottom.
A layer of gravel covered with sand tight, not forgettingto stamp it and pour water, providing a strong shrinkage.
On the bottom of the pit to create a drainage layer of gravel and sand.
The bottom need to pour a layer of gravel to improve the drainage properties.
The soil is dug groove shaped flower beds,poured down a layer of gravel.
When ustynut curbs, poured a layer of gravel 15 cm, raising it above ground level.
The bottom of the pit carefully stamped and slept 30-centimeter layer of gravel.
Floors need to fill 15-cm layer of gravel(on 15 cm sand) and pour concrete.
For this purpose, the bottom is filled 10 cm of coarse sand and on top- a layer of gravel.
On top of the sand fill 10-cm layer of gravel, on top of which pour a small layer of concrete.
For this purpose, the bottom of the pool, slept a 15-centimeter layer of gravel and crushed stone.
Also, if you're planning to add a layer of gravel to the pond in your water garden, be very careful not to add too much.
After that empty space on theentire circumference of the pillars is filled with a layer of gravel.
To strengthen the foundations poured a layer of gravel and 10 cm of sand.
Determine where to install the plates and pillarsinidentified areas of fertile soil layer is removed and poured a layer of gravel.
A small packet of dressing is placed in a layer of gravel under the plant.
First they fill up the 10-centimeter layer of gravel and sand, compacted, on it laid a metal grid and concrete is poured a solution.
The bottom of the hole is sealed by a concrete screed orsimply poured a layer of gravel, providing drainage.
On top of this layer fall asleep, another layer of gravel, but only smaller fractions, the layer thickness of not more 10 cm.
The construction will be flat for a long time,if at the bottom of the trench fill layer of gravel and tamp it well.
The variant of placing basin above the ground, strewn with a layer of gravel, which will act as drainage and prevent the emergence of dirt near the sink.
The bottom of the resulting trench must be thoroughly compacted and fill it 40 cm of gravel, which fill the following,10-inch layer of gravel, or even expanded clay.
There are two possibilities: land plant,and then fall asleep a layer of gravel or crushed rock, or first make the filling, and then planted plant.
Depending on the size of the central part it can beoccupied lawn grass ground cover, a layer of gravel or colored decorative sawdust.
Because, what would the fence lasts longer,you must create a drainage layer of gravel or sand(you can simultaneously use both).
During the construction of the reservoirbottom of the pit is often lining layer of gravel or sand, over which is laid waterproofing material.
In order, that would make the filter last longer,it is recommended to sprinkle a layer of gravel(because. the gravel prevents the collapse of the rock and dirt in the pipe).
What would the water not going near the Foundation of the terrace,you need to make a small drainage layer of gravel and sand, sprinkle it with soil, creating a slight slope from the Foundation.
In order, what would the beam not pressed into the soil under the action of loads buildings,you must create at the bottom of the trench a drainage layer of gravel and sand or make a trench 15 cm deep, pour these 15 cm concrete solution and firmly planting it in the log.