Приклади вживання Working documentation Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Working Documentation.
Project and working documentation;
Working Documentation.
Third stage. Working documentation.
Working documentation for builders.
Analysis of the working documentation.
Working documentation package includes:.
Magazines and working documentation.
The working documentation is developed by the project organization sufficient for the construction volume.
Status: project, working documentation.
Project documentation development: Environmental Impact Assessment(EIA), stage«P» and Working Documentation«P».
Stage“Working documentation”(W).
Development of design and working documentation;
If I study the working documentation, then I'm not distracted by anything else.".
Preparation and coordination of design and working documentation.
Development of technical and working documentation for a water boiler of 0.63 MW capacity. 2004-2005.
Here are special tools for 3D-designing, product modeling, working documentation production.
Development of technical and working documentation for a water-heating water-tube boiler of 2 MW capacity. 2002-2003.
Design: sketch planning, project development on the stages Project and Working Documentation, field supervision.
Developed design and working documentation for construction, reconstruction and renovation of the Orthodox churches(1993-2011,).
Therefore, there was such a thing as working documentation in construction.
Working documentation for the expansion and improvement of the system's functions(automated construction condition monitoring system) at the Dniester HPSPP was developed;
Integrated design of objects, development of design and working documentation, construction supervision.
The project and working documentation of the emergency power plant 12МW on the basis of f Caterpillar power machines is developed.
The new construction project- composition of all the necessary preproject, designing and working documentation for the objects during the new construction.
Working documentation on the implementation of the Construction Emergency Early Detection and Broadcast System was developed.
The Company MEP Engineering was involved by the development companyWainbridge to produce the internal engineering systems Working documentation for the apartment complex with a total area of 36,000 m2.
Also, the working documentation includes working drawings and additional documents that are attached to them, required specifications, and more.
Lviv project instituteacted as a general engineer in developing the project and working documentation for the reconstruction and expansion of the existing administrative and production premises of the brewery.
The bid includes the development of design and working documentation which must achieve a positive assessment by the experts, construction work, and the cost of Ukrainian and foreign equipment.