Now carry out works on installation of the bowl:.
A team of over 40 experienced professionals with high quality andon time carries a full package of works on installation of.
Free roofing works on installation of roof.
Works on installation of windows are under way: 1 floor.
In the first section of the A52 residential complex monolithic works on installation of technical premises on the roof are being completed.
Works on installation of metal-plastic windows- 95%.
But here it is very important to know the sequence of all the works on installation of the floor under the laminate film, to get high quality results.
Works on installation of doors on the technical floor.
Manufacturer of brewing equipment«SCHULZ» has already finished the installation and commissioning works on installation contract brewery in Poland.
Works on installation of doors on the 1st floor of section A.
Also the breakdown is not only important at the initial stage, but in the course of construction or installation works on installation of equipment.
Works on installation of metal and plastic windows are ongoing- 70%.
A team of over 40 experienced professionals with high quality andon time carries a full package of works on installation of power supply, ventilation and air conditioning supply emergency diesel generators.
Works on installation of external engineer networks are in progress:.
Large, long-term experience of our employees, modern methods of work, the use of the latest design solutions and materials in the work permitas soon as possible to carry out works on installation of silos, connecting all the necessary systems:.
Active works on installation of walls, partitions, brickworks are in progress.
During the 4th quarter 2015, works on installation of internal engineering networks and accomplishment of territory continued.
Works on installation of window structures: section B- on the 17th floor.
The VFS technology allows performing works on installation practically all-the-year-round, with the exception of extremely low temperatures and direct precipitation.
Works on installation of vertical elements of the 1st floor at section Б**.
Construction Company“Horos” has successful completed works on installation of cast-in-place foundations for dead-end tower№15 under the project«Construction of a diversion of 330 kV OHL Novokahovska- Khersonska».
Works on installation of walls, partitions, brickworks(external -90%, internal- 71.7%) are in progress.
Works on installation of walls, partitions, brickworks(external -90%, internal- 96.7%) are in progress.
Works on installation of wall-mounted light fixtures have a similar sequence of actions, Only they are easier to mount, because they do not have to raise your hands up:.
All works on installation and construction of solar power plants are carried out strictly in accordance with the requirements of existing rules and regulations for the installation of electrical installations, design documentation, as well as in accordance with the requirements and recommendations of manufacturers of equipment used.
Work on installation of apartment doors and MZC is underway- 85%.
Special work on installations.
Work on installation of windowsills and low tides on windows and balconies- 90%.
To perform work on installation of facade systems the company has the required number of equipment, devices and instruments.