CEO of"Danube Bridge Vidin-Calafat".
Mr. Radu Berceanu was met by the Manager of the Project“Danube bridge Vidin-Calafat”- eng.
The Danube Bridge Vidin-Calafat was opened on 14 June 2013.
After examining the construction of the Bridge Vidin-Calafat, eng.
The Project“Danube Bridge Vidin-Calafat” is included in the Danube Strategy, so important for Bulgaria.
The Deputy Manager of the project“Danube Bridge Vidin-Calafat”- eng.
Every year the construction of Danube Bridge Vidin-Calafat is visited by students of various civil engineering specialties.
For a third time the team of the German TV shot reportage for the construction of Danube Bridge Vidin-Calafat.
Indeed, the opening of the bridge Vidin-Calafat was an important moment.
The assembly of the vessel impact protections has begun at the last pier of Danube Bridge Vidin-Calafat.
The interest of the young people in Danube Bridge Vidin-Calafat is growing more and more.
The Open Door Day again gathered more than 60 people,willing to see the construction of Danube Bridge Vidin-Calafat.
After the signing of Act 16, Danube Bridge Vidin-Calafat will be handed over to the State.
The total length of all the road junctions of the Adjoining Infrastructure to Danube Bridge Vidin-Calafat is 760, 89 m.
The construction of pier РВ9 of Danube Bridge Vidin-Calafat in the navigable channel of the river was completed.
Two of them last year showed interest andvisited the Open Day of Danube Bridge Vidin-Calafat in early July.
The Constructors of Danube Bridge Vidin-Calafat- Spanish, Portuguese, Czechs, Romanians, got acquainted with this ancient tradition.
The Manager of Project“Danube bridge Vidin-Calafat”- eng.
Engineers from“TransKapStroi” andthe“Designers Institute”- Moscow got acquainted with the construction of Danube Bridge Vidin-Calafat.
Slavi Binev is the second MEP that visited the Danube Bridge Vidin-Calafat while it is being constructed.
One of the emblematic Bulgarian vocal groups-“Yulangelo” sang Virgin Mary's hymn for the good luck of the Danube Bridge Vidin-Calafat.
Daily traffic on the Danube Bridge Vidin-Calafat is a 1200-1300 vehicles, 80-90% of which are trucks, said Mr.
After the speed and loading tests of the motorway andrailway at Danube Bridge Vidin-Calafat, Act 14 will be signed.
The assembly of the segments of the superstructure of the bridge Vidin-Calafat was started at pier РВ11 in the navigation channel of the river.
The official German delegation from Region Ortenau, The Federal Republic of Germany,visited Danube Bridge Vidin-Calafat.
Of the construction works of the Infrastructure to Danube Bridge Vidin-Calafat, under the contract, have already been executed.
With today's signing of Act 15, the company Contractor of Danube Bridge Vidin-Calafat, FCC Construccion, handed over the bridge to the Engineer(the Construction Supervision) of the Project.
So, subsequently, I worked as a PR expert for the construction of the Danube Bridge Vidin-Calafat, built by the Spanish company FCC Construction.
The assembly of the segments from the superstructure of the bridge Vidin-Calafat was commenced in the navigable channel of the river at Pier PB9.
After examining, with great interest, what has been constructed of the bridge Vidin-Calafat so far, accompanied by the management team of FCC Construccion- eng.