Примери за използване на Construction line на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Opening construction line and level.
Opening of a construction site and determining of construction line and level.
External construction line" is the line of construction to the street.
Opening of the construction site and determining of a construction line and level.
Without being compiled record for construction line and level and/or without the order book being certified;
Memorandum for opening a construction site and determining the construction line and level.
Protocol for determining the construction line and level of inspection results.
The fences shall be constructed according to existing property boundaries without construction line being given for them.
A construction line has been given for starting work on object"Repair of overhead line 20 kV"Banya" from substation"Razlog" to Pylon 421".
Opening of the construction site and defining of the construction line and level.
Internal construction line" is the line of construction to the neighbouring regulated landed properties or to neighbouring buildings.
A plot of land for sale in Sunny Beach,suitable for construction- building permit, on a construction line.
(2) When the boundary construction line falls within the range of the road it shall be moved and located along the outer end of the boundary strip.
Obtaining planning permission for external communications; Provision of protocols for construction line and elevation- the final document preceding the construction. .
The two buildings are built on common construction line in contrast to the multi-storey building of the socialist period, which, with a new urban design, is pulled back behind a wide pavement.
Depth of the basic construction of buildings" is the distance from the external construction line to the opposite internal construction line.
Opening of the construction site and determining the construction line and level is accompanied by an enacted building permit and in the presence of officials from the municipality, the person exercising constructional supervision for the site or a construction foreman for the fifth category sites.
Where their failure to appear shall not preclude the drawing up of a protocol to open a construction site and determining the construction line and level of the construction. .
For the opening of the site and the determining of the construction line and level a record is drawn, with an indication of regulation and elevation benchmarks.
The failure of a municipal official to be present on the site will not prevent the drawing up of the construction site opening statement and of a construction line and a building level;
Making the different reports and acts that come along the constructional process/opening a construction line, order book and all other necessary acts and documents up till act 15 including. Yes No.
(2) In the angle regulated landed properties when the construction lines coincide with the street regulation lines along both of the streets,in the zone of the crossing the construction line has to go back from the cross point of the street regulation lines of the regulated property at least at a distance 2 m.
The date of commencement of the construction works is deemed to be the date on which the protocol of opening of the construction site and of determining the construction line and level(Protocol 2) is signed by the supervisor.
The record for the opening of the construction site and determination of the construction line and level is kept indefinitely in the archives of the administration which issued the construction permit.
GeoBul Ltd. performs geodetic surveying, needed during the construction of buildings and engineering facilities andrequired for the legal reports for the construction line and level, protocols for reached control levels and control imaging of foundations.
Opening of a construction site and determination of a construction line and level, and also certification of orders record book shall be made upon presentation by the contracting authority of an approved management plan for construction waste, an approved plan for safety and health, a contract for construction realization with a builder who is registered in the Central Register of Professional Builders with exception of constructions under Art. 14, Para.
The starting of construction in accordance with the issued building permit is the day the protocol for opening the construction site is drafted and the construction line and level are determined, and when this is not required- the date of certification of the order book.
Of the Chamber of Builders Act shall reflect the result of the implemented check at reaching of the controlled levels in the record for determining of construction line and level, including the note, that the underground conduits and facilities before filling up are reflected in the specialized maps and registers, and in three days term send certified copy of the record to the municipality(the region).
(3) The distances of para 1 shall be admitted to be decreased in the cases when the existing buildings are preserved and included in the system of building up of the detailed development plan,the construction line of the new buildings being determined by the construction line of the existing buildings when they are predominating.
Of the Chamber of Builders Act shall be obliged, before continuing the following construction and mounting works, to implement check and to establish the compliance of the construction with the approved investment designs, the permission for construction andthe record for determining of construction line and level, at level excavation being compulsory the presence of the engineer- geologist and the designer of the construction part.