Примери за използване на Notified body may на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The notified body may request other samples as necessary.
Should batches be rejected frequently, the notified body may suspend statistical verification.
The notified body may make reasoned requests for further specimens.
In the event of frequent rejection of lots the notified body may suspend the statistical verification.
The notified body may pay unexpected visits to the lift installation sites.
In the event of frequent rejection of lots the notified body may suspend statistical verification.
The notified body may ask for further samples if the test programme so requires.
In the event of the frequent rejection of lots the notified body may suspend the statistical verification and take appropriate measures.
The notified body may ask for further samples if the test programme so requires.
(5) The CE marking and, where applicable,the identification number of the notified body may be followed by any other mark indicating a special risk or use.
The notified body may not deliver the certificate if the EMEA's scientific opinion is unfavorable.
During such visits, the notified body may carry out full or partial audits.
The notified body may issue the European approval for materials taking into account the comments submitted.
If the corresponding TSI allows, the notified body may issue certificates of compliance on certain parts of the subsystem or a series of subsystems.
A notified body may be involved in the production phase, depending on the conformity assessment procedures applied.
Additionally the notified body may pay unexpected visits to the installer.
The notified body may not require detailed plans or precise information not necessary for verifying the conformity of the lift.
In addition, the notified body may pay unexpected visits to the manufacturer.
The notified body may issue intermediate statement verifications to cover certain stages of the verification procedure or certain parts of the subsystem.
In addition, the notified body may carry out unscheduled visits to the manufacturer.
The notified body may require any information or data from the manufacturer, which is necessary in order to properly conduct the chosen conformity assessment procedure.
In addition, the notified body may pay unexpected visits to the manufacturer.
The notified body may require the application to be completed by further tests or proof to allow assessment of conformity with the design-related requirements of the Directive.
Additionally, the notified body may pay unexpected visits to the lift installation sites.
The notified body may require, where duly justified, any information or data which is necessary for establishing and maintaining the attestation of conformity in view of the chosen procedure.
Additionally, the notified body may pay unexpected visits to the manufacturer of the safety component.
The notified body may not require detailed plans or precise information not necessary for verifying the conformity of the lift about to be placed on the market with the model lift described in the EC type-examination declaration.
Additionally the Notified Body may pay unexpected visits to the sites mentioned in point 5.2 of the applicant(s).
Moreover, a notified body may only use its number in relation to conformity assessment activities carried out under the specific conformity assessment module that requires the intervention of a notified body, and for which it has been notified. .
At the time of such visits, the notified body may, where necessary, carry out or ask for tests in order to check that the quality system is working properly.