Примери за използване на Passengers per hour на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Passengers per hour.
Its capacity is about 750 passengers per hour.
The projected terminal will have 4 check-in desks and a capacity of 454 passengers per hour.
Terminal capacity in the peek hour- 600 passengers per hour(arrivals and departures);
When Terminal 2 was opened back in 2006 the airport reached a capacity of 2000 passengers per hour.
With capacity of 50 thousand passengers per hour, daily carried passengers are 1.2M.
The new terminal's capacity will be 400 passengers per hour.
The capacity of the Terminal is 600 passengers per hour(360 arrivals and 240 departures at IATA class C service level).
The city's main cruise ship terminal is the Port of Istanbul in Karaköy, with a capacity of 10,000 passengers per hour.
The tunnel, which will have the capacity to carry 150,000 passengers per hour in both directions, is expected to reduce traffic congestion.
The airport has two terminals(arrivals and departures),with a capacity of 4,500 passengers per hour.
Optimal load of bus ortrolley route- no more than 3-4 thousand passengers per hour, tram can carry up to seven thousand passengers, and in certain circumstances- and more.
The existing terminal can handle up to 140 passengers per hour.
The arrival hall capacity has been doubled to reach a volume of over 1,000 passengers per hour, and passenger management will be streamlined thanks to a substantial expansion of the customs.
There are 33 cabins, each contains ten seats, which makes the capacity of 1,200 passengers per hour.
The capacity is about 700 passengers per hour.
It will consist of 33 cabins, with 10 seats each, and the loading capacity of 1 200 passengers per hour.
The terminal capacity is 140 passengers per hour.
Eleven ski lifts andthree cable cars with a total length of 5,700m and capacity of 11,100 passengers per hour.
Its bandwidth capability- 2,000 passengers per hour.
It has one runway(an older runway serves as a parking area for disused aircraft) andhas a capacity of 700 passengers per hour.
It can accommodate 2,500 passengers per hour.
The passenger terminal was designed for international and domestic flights handling with 400 passengers per hour capacity.
The gondola lift will have 25 cabins equipped with LED lighting, air conditioning, Wi-Fi anda capacity of 3,000 passengers per hour, which will be transported at speeds of five to six metres per second.
The Expo 2020 will have its own dedicated Dubai Metro station on the Route 2020 line,capable of transporting 40,000 passengers per hour and off-site.
The terminal building, with an area of 1300 m2, provides a steady flow from 200 to 400 passengers per hour, or 100,000 to 150,000 passengers per year.
It is designed to transport up to 20,000 passengers per hour.
It has the capacity to accommodate 2500 passengers per hour.
Expo 2020 site will have its own dedicated Dubai metro station on the route 2020 line,with carriages carrying 40,000 passengers per hour to and from the site.