Примери за използване на Residual risk на Английски и техните преводи на Български
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Management of residual risk.
The residual risk in our society….
There was therefore no residual risk.
Residual risk can also be known as“retained risk”.
Inform users of residual risk.
Compare the residual risk with the risk appetite;
After Chernobyl and Fukushima,it is clear that nuclear power will always involve a residual risk.
Deciding whether residual risk levels are tolerable.
For the first year, programmes are put under reservation when the cumulative residual risk is above 2%.
The Commission considers the residual risk of error to be sufficiently mitigated.
The residual risk to be covered showed that the IAC's 2007 work plan to be appropriated.
Determining if the levels of residual risk are acceptable;
It focuses on residual risk taking account of the mecanisms already in place.
However, even in this particular scenario the residual risk was found to be very small.
The final residual risk is limited and evidenced, and any further development would not be cost-efficient.
Where elimination of risks is not possible,the risks should be reduced and the residual risk controlled.
The cumulative residual risk is a second filter to decide on the need for additional reservations.
Since 2012, in its annual activity reports(AAR), the Commission calculates andpublishes an indicator called cumulative residual risk(CRR).
The Commission recognises that a certain residual risk of error remains even at the completion of all these checks.
The Commission thus considers that there is no significant risk that the cumulative residual risk it calculated is understated.
The critical issue is the level of residual risk we are prepared to accept in the context of the cost of remediation.
The level of residual risk(errors that remain uncorrected) which can be accepted will be examined towards the end of 2008 in a Communication from the Commission.
In its closure declaration, the audit authority has to disclose a residual risk rate per OP(or group of OPs) for the whole programme period.
The corresponding cumulative residual risk for the group of all eight programmes taken together, after corrections were made by the concerned certifying authority, was below 2%.
The caracteristics of the transactional ex-post controls are based on an appreciation of residual risk and of the interaction with the other components of the control system.
Therefore, the concept of a‘residual risk rate at closure is currently not compatible with the legislation underpinning the second pillar of the CAP.
At the same time, DG Regional andUrban Policy introduced the calculation of a cumulative residual risk, taking into account financial corrections implemented by Member States.
In the framework of the follow-up task, residual risk is reassessed and the significance of the recommendation may be downgraded.
Comparing the two enables the Commission to conclude on the annual residual risk to the EU budget after all controls and corrections are taken into account.
Accordingly, we can only take this residual risk into account to a limited extent and should understand that nuclear energy can only be a stop-gap technology.