Примери за използване на Work center на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Work Center.
E6 PTP Work Center.
Work Center.
E6 PTP Work Center.
Work center And CNC Router.
Хората също превеждат
E3 Venture Work Center.
Work center And CNC Router.
To achieve better flow,Ford limited the space allotted for work-in-process between each two work centers.
Work Center" Capsules and Tablets.
In essence the Kanban system directs each work center when and what to produce but, more importantly, it directs when not to produce.
But that will not be the case under Lean,which mandates permanently holding containers for each product between each two work centers.
Collecting and research work Center"Aleph" conducst deeper collective and researching work. .
From its base in Havana, furthermore, the Group has sections operating in a large part of the national territory, andeach member is active within his own work center.
Work Center"Dry Injections" used for the production of powders for parenteral application by aseptic filling;
Charles Conley, born and raised on Long Island, was a 2009-2010 fellow at Teachers& Writers Collaborative in New York anda 2008-2009 fellow at the Provincetown Fine Arts Work Center.
This is the notification to that work center that a container was withdrawn, that the allotted inventory is not full.
Charles Conley, born and raised on Long Island, is currently a fellow with Teachers& Writers Collaborative in New York andwas a 2008-2009 fellow at the Provincetown Fine Arts Work Center.
His work centered on investigations of the sensory perceptions of the honey bee and he was one of the first to translate the meaning of the waggle dance.
It makes it very visible to spot the real problems that jeopardize the flow- when one work center in a line stops producing for more than a short while, soon the whole line stops.
That is the essence of the flow lines, as can be verified by the fact that the first flowlines didn't have any mechanical means, like conveyers, to move inventory from one work center to another.
Balancing the flow is not equal to balancing the capacity- having the capacity of each work center match its load- a common mistake made when balancing flow lines.
In addition, the system is cable of planning the production process based on information anddemand forecasts as well as the time needed for execution of production load on different machines and work centers.
That includes data,collected offline through our consumer work centers(offices, workshops, warehouses), direct marketing campaigns, also online through our websites(“Websites property of Ramer Group LTD”), applications and third party branded webpages.
You can define your manufacturing resources, including machines, employees, tools oreven sub-contractors as work centers and allocate them to work center groups.
Between each two work centers(to reduce the number of places containers must be held,Ohno extensively used U-cells rather than using work centers that are composed of a single type of machines), and for each component separately, the accumulation of inventory is limited by setting a certain number of containers and the number of units per container.
Six Sigma is a statistical method based on the concept“variations of the process” that takes into account different variables(eg the waiting time for a product in front of a work center which can vary from seconds to minutes).
In addition, the system allows you to accurately plan production based on information about the actual and forecast demand, as well as the time required to complete orders andthe current workload of the various machines and work centers.
In addition, the system is cable of planning the production process based on information anddemand forecasts as well as the time needed for execution of production load on different machines and work centers.