英語 での Roadbed の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Only the roadbed remains.
Roadbed and road drainage.
Recycled roadbed materials.
Roadbed in the wind and sand area.
Stable the roadbed of railway.
Pedestrians- a priority in the transition through the roadbed.
Stable the roadbed of highway.
More than 1,000 cubicmeters of rock was blasted to build a roadbed.
Backing roadbed filling reinforcement.
Figure 1: Setup with two passenger vehicles andone tractor trailer truck on a roadbed.
Strengthening soft roadbed of airport.
We sat on the roadbed, listening to talk about the old BU rabbit and carrot story.
About 70% of the inorganic componentsare reused for materials such as construction or roadbed materials.
To stable the roadbed of the high road.
Roadbed, track, curve radius and other infrastructure is expected at 350 km per hour standard design and construction.
Strengthening soft roadbed of high-class roads.
CQUY550 Crawler crane has strong hoisting capacity, big lifting weight, good anti-slip property,lower roadbed requirement.
Preventing leakage in roadbed and other groundsill.
CQUY800 hydraulic crawler crane has strong hoisting capacity, big lifting weight, good anti-slip property,lower roadbed requirement.
Here, I saw the most beautiful snow, roadbed with the red fence in the snow formed a new landscape.
A double whammy, noon, Long County, not long after our car, but also met a larger cave,in front of came news that a rock smashed the roadbed, cars could not before.
Roll over the gravel road, roadbed was washed only about two wheels, wide, and the driver is actually very sure that the car no problem to open in the past.
Double wall corrugated pipe are widely used in highway,railway roadbed, the Mass Transit Railway.
Using recycled ballast in work method for roadbed improvement A roadbed improvement method was developed using grout injected discarded ballast.
The Pennsylvania Railroad bought the Columbia in 1857 andbegan changing the roadbed for what became the Main Line to the west.
Soft foundation treatment is used when the roadbed is filled at a height of 3-4 meters or the bridge and bridge joints to prevent uneven settlement.
No. 3, prepared via Fujian, to Nianba all along the way encounter road blasting had to get off come from Fujian, Jiangxi, is taking the high-speed,but still roadbed.
The isolation of the railway dregs and the roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials.
Fundamentally speaking, roadbed treatment is a method of stabilizing the foundations of the pavement. But IKEE's method can facilitate sufficient strength and durability by using special emulsified asphalt and cement.
The technique involves removing ballast, excavating the roadbed, installing rectangular bags containing ballast, introducing more ballast between the rectangular bags(Fig.3), and applying ultra high-early strength mortar Fig.