Ví dụ về việc sử dụng Then specify trong Tiếng anh và bản dịch của chúng sang Tiếng việt
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Select the hatch pattern and then specify the area where you want to add the hatch.
In the Split Date into Multiple Worksheets dialog box,please choose Fixed rows and then specify the rows number in the box.
Select File> Export> Scene, and then specify the name and location on the disk for this action.
To set up an alert for a saved query,click the Update link for that query and then specify the alert settings.
Enter your email address, and then specify what type of email address you want to use(either POP3 or IMAP).
All you have to do is sit back,wait for matches to come in, and then specify if you like them or not.
Then specify a graphic format in the Export format drop-down list, and finally click the OK button. See screenshot.
Set the event name and the website ID and then specify additional parameters.
To use a different method to determine the error amount,click the method that you want to use, and then specify the error amount.
Select Connection> Only the List Below, and then specify the IP addresses of the devices that will be connecting to the SMTP server, such as printers.
Apply the utility by clicking Kutools> Content>Spell Out Numbers, and then specify the languages in the dialog box.
If you want to use this type of column to specify multiple recipients, you can create a SharePoint group that includes thepeople that you want the workflow to address the e-mail to, and then specify the group in the field.
Png images, you can click the Import format box and then specify the PNG from the drop down list.
You don't need to convert business card dimensions from inches to pixels in many graphics programs(like Adobe Photoshop)because you can designate the inches and then specify 300ppi for the document.
In the Split Date into Multiple Worksheets dialog box,please choose Specific column and then specify a column which you want to split data based on from the drop-down list.
To enable auditing for the documents and items that are subject to this policy,choose Enable Auditing, and then specify the events you want to audit.
(3) To change the highlight color,you need to click the Settings button on the Design tab, and then specify a locked range color, and click the OK button.
A better method would be to give the element a class attribute oran id, and then specify its style by that class or id.
In the Export Range to File dialog box,select the PDF option in the File format section, and then specify other options as follows.
To do this step correctly, though,you have to understand the relationships between your tables, and then specify these relationships in your database.
To do this step correctly, though,you have to understand the relationships between your tables, and then specify these relationships in your database.
To add the RunMacro action to a VBA procedure,add the RunMacro method of the DoCmd object to your procedure, and then specify the name of the macro that you want to run.
For example, to see birthdays that fall between the current date and the end of the year,click Between, and then specify the appropriate start and end dates in the Between dialog box.
To do this step correctly, however,you must first understand the relationships between your tables, and then specify these relationships in your office access 2007 database.
To do this step correctly, however,you must first understand the relationships between your tables, and then specify these relationships in your office access 2007 database.
In the Export Range to File dialog box, choose CSV(Comma delimited)from the File format option, and then specify the Save directory to save the new csv file, see screenshot.
If you want to specify other email sending mode,please uncheck Send emails via Outlook, and then specify the outgoing server setting in the popping out dialog.
To specify a retention period for documents and items that are subject to this policy,click Enable Retention, and then specify the retention period and the actions that you want to occur when the items expire.
To specify a retention period for documents and items that are subject to this policy,choose Enable Retention, and then specify the retention period and the actions that you want to occur when the items expire.