Examples of using Each pipe in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Each pipe shall be subjected to the hydrostatic test.
Make black paints painting on each pipe, then make bundles.
Packing: Each Pipe end is protected by Plastic cap.
Coil pipe cooling system:there are 22-30 pipes lied in the water pond, each pipe 6 meters long, oil gas can be cooled in.
Packing: Each Pipe end is protected by Plastic cap.
(2) The workers are equipped with the computers to ensure theproducts they made are of high precision, each pipe of 5 or 6 meters only has 2 or 3 screw differences inside the pipe. .
Packing: Each Pipe end is protected by Plastic cap.
The workers are equipped with the computers to ensure theproducts they made are of high precision, each pipe of 5 or 6 meters only has 2 or 3 screw differences inside the pipe. .
(13) of each pipe after hydrostatic test pressure radial seal.
The steam header is the main equipment of boiler for thesteam produced during the boiler operation assigned to each pipe, steam header pressure equipments, pressure vessels, its bearing capacity, capacity should correspond to form a complete set of boiler.
Each pipe is tested by hydrostatic pressure, and the pressure is sealed by radial seal.
The standard length of the each pipe is 4 meters, and the outer diameter is 27.8mm to 28mm.
Each pipe fitting tee after air tightness test, ensure no leakage.
Water should be pumped before pumping concrete,check the joints of each pipe to ensure that the seal does not seep water, and then pump the mortar to lubricate the pipe and at the same time The air is discharged.
In each pipe system there may be a leakage from one of the joints or pipes, for which a sealing is required to seal the source of the leak and allow the flow of liquids as usual.
Layers of pipe, each pipe has 9 holes, total 81 holes.
Packing: Each Pipe end is protected by Plastic cap. Then packed by Anti-rust steel strip, The outside of the bundle is plastic woven bag, or Plastic film.
Layers of pipe, each pipe has 25 holes, total 250holes.
Conducted for each pipe eddy current inspection after the low and medium pressure boiler pipe hydrostatic testing is not necessary to replace the hydrostatic test eddy current testing.
Meter is installed on each pipe, in such a case should be installed immediately 5 meters for 1 apartment.
A999/A999M: Each pipe shall be subjected to the nondestructive electric test or the hydrostatic test, the Thpe of test to be used shall be at the option of the mfg, unless otherwise specified in the PO.
Bubble pack for each Pipe Fitting packaged within carton box or plywood case, depending on order quantity and the way of transport.
X-ray detectionⅡ: Each pipe after expansion and hydro test is subject to X-ray industrial TV inspection and pipe-end weld filming.
A999/A999M: Each pipe shall be subjected to the nondestructive electric test or the hydrostatic test, the pipe of test to be used shall be at the option of the mfg, unless otherwise specified in the PO.
A999/A999M: Each pipe shall be subjected to the nondestructive electric test or the hydrostatic test, the pipe of test to be used shall be at the option of the mfg, unless otherwise specified in the PO.
To visually inspect each pipe checking ID/OD, measure ovality, camber, length, inner diameter, and outer diameter and look for any obvious blemish which could lower the rating of pipe and mark them for the grinders to correct any pits, undercuts and other blemishes!
Each alloy pipe is subject to PMI before dispatch.
Each fitting pipe will be covered by plastic cover.
Tests NPS test 1 pipe for each lot of.
Each coil of pipe be in cartons.