Examples of using Technical evaluation report in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Technical Evaluation Report.
UNMIL is now current in the submission of technical evaluation reports to the local committee on contracts.
Technical Evaluation Report.
In addition, the dates for commencement of operations shown in the technical evaluation report pertaining to Proposer B were incorrect.
Technical Evaluation Report if the amendment was a location change.
It is unfortunate that Procurement overlooked the fact that the Transport Section had mentioned aseating capacity of 31 for… buses in the technical evaluation report.
Technical evaluation reports were prepared for the respective sites.
The Department of Field Support commented that discussions among the responsibleunits had generated an improvement in the submission of the technical evaluation reports.
Technical evaluation report if the amendment includes(changing the site, adding an activity, cancelling an activity).
In the meantime however,these operational dates were overtaken by the delay in preparing the technical evaluation report, which was finalized on 22 March 2001.
As at 18 March 2010, all technical evaluation reports in the 2009/10 financial year had been acceptable to the local committee on contracts.
In paragraph 150, the Department of Peacekeeping Operations agreed with the Board 's recommendation that it monitor on a regular basis the submission of the aviation technical evaluation reports.
As at 18 March 2010, all technical evaluation reports in the 2009/10 financial year had been acceptable for the Local Contracts Committee.
In the opinion of the Office of Internal Oversight Services,the Division should have ensured the factual accuracy of the technical evaluation report before its transmittal to the Procurement Division.
The comment made in the technical evaluation report, to the effect that Proposer B had provided the information for only five airfields, was factually incorrect.
UNMIL conducted an evaluation of the processes, procedures andcapacities of personnel involved in all stages of the preparation of technical evaluation reports, from initiation to completion.
The Department of Field Support responded that the technical evaluation report had been completed within four months and submitted to the Procurement Division on 11 April 2007.
As indicated in paragraph 150 of the Board ' s report for 2005/06, the Department of Peacekeeping Operations agreed with the Board 's recommendation that it monitor on a regular basis the submission of the aviation technical evaluation reports.(Reference is also made to paragraph 171 of the Board ' s report for 2004/05.).
The technical evaluation report gave the impression that Proposer B was awarded zero points because it could not commence operations at those airfields before contract award.
The Board recommends that the Administration ensure that UNMIL prepare technical evaluation reports in a consistent way for consideration by the local committee on contracts.
The technical evaluation report provided a description of the specific technical requirements, the points awarded to each bidder, and the basis for awarding points against each specific requirement.
In the opinion of the Office of Internal Oversight Services,the statement in the technical evaluation report that Proposer B did not provide an equipment list for any airfield was clearly contrary to facts.
The technical evaluation report of the Field Administration and Logistics Division mentioned that Proposer B" did not provide an equipment list for any airfield" and awarded only 10 out of the 30 points allocated for this requirement.
In paragraph 130,the Board recommended that the Administration should ensure that UNMIL prepares technical evaluation reports in a consistent way for consideration by the local committee on contracts.
The technical evaluation report of the Field Administration and Logistics Division stated that Proposer B appeared to provide the services only 12 hours a day, 7 days a week and, for that reason, only 120 points had been awarded out of 180(66.6 per cent).
With regard to the requirement for the provision ofadequate equipment for emergency/crash rescue services, the technical evaluation report stated that Proposer B was providing two firefighting units for Kinshasa only, and that the remaining 10 were to be provided by the United Nations.
Furthermore, the technical evaluation report stated that Proposer B ' s plan for providing emergency/crash rescue training was" fully compliant", yet gave only 18 points out of 30(or 60 per cent, which is less than the 70 per cent minimum).
On vendors ' performance evaluation, the Board noted lapses at the United Nations Mission for the Referendum in Western Sahara(MINURSO), the United Nations Disengagement Observer Force(UNDOF) and MONUC,and at UNMIL inconsistencies were noted in the technical evaluation reports submitted to the local contracts committee.
The mandated in-depth evaluation report on the technical cooperation programme on competition law and policy, with special attention to the impact of the programme on end users.