Examples of using Engineering controls in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
A4.3.8.2 Appropriate engineering controls.
Even where engineering controls and safe systems of work have been applied, some hazards remain.
(a)" maintain air concentrations below occupational exposure standards",using engineering controls if necessary;
Engineering controls: Install a closed system or local exhaust as possible so that workers should not be.
The elimination or reduction of respiratory hazards through substitution or engineering controls is preferred.
Even where engineering controls and safe systems of work have been applied in the workplace, some hazards may remain.
Personal protective equipment canfurther reduce individual exposure where engineering controls and work practices prove insufficient.
Engineering controls and air-quality testing are used to confirm that no contamination occurs as a result of ACM abatement activities.
Employers can reduce worker exposure by using engineering controls such as an oil mist collector or similar extraction system.
All ACM in Headquarters buildings are currently maintained in a non-friable, or encapsulated, state by inspections,testing and engineering controls.
The effectiveness of these interventions(e.g., engineering controls, ventilation changes) should be verified by follow-up air sampling.
Engineering controls involve isolating employees from work-related hazards without relying on worker behavior, and can be the most cost-effective solution to implement.
If applicable, use process enclosures, local exhaust ventilation,or other engineering controls to maintain airborne levels below recommended exposure limits.
On September 6, 2017, the National Institute for Occupational Safety and Health(NIOSH)published a Program Performance One-Pager entitled NIOSH Engineering Controls Program.
Isocyanates are known skin and respiratory sensitizers, and proper engineering controls should be in place to prevent exposure to isocyanate liquid and vapor.
A4.3.8.3.1 Consistent with good occupational hygiene practices, personal protective equipment(PPE) should be used in conjunction with other control measures,including engineering controls, ventilation, and isolation.
Section 8 Exposure controls/Personal protection-lists OSHA's permissible exposure limits, threshold limit values(TLVs),appropriate engineering controls, and personal protective equipment(PPE).
The personal protective equipment, engineering controls and use pattern changes required to mitigate worker exposure during the phase-out period were described.
For all the facilities noted in the above paragraph, applicable regulations of the hostcountry are followed with regard to monitoring, engineering controls, removal and disposal of asbestos-containing materials.
Hazard controls appropriate for these workers include engineering controls such as negative pressure ventilation rooms, and personal protective equipment appropriate to the job task.
Now all businesses undertakingwelding activities should ensure effective engineering controls are provided and correctly used to limit fumes arising from the welding activities.
Employers have multiple methods at their disposable to mitigate the risk,including engineering controls, administrative controls, and implementing a hearing protection program.
All businesses undertakingwelding activities should ensure effective engineering controls are provided and correctly used to control fume arising from those welding activities.
Where COVID-19 hazards cannot be eliminated,the most effective controls are engineering controls, followed by administrative controls, and lastly personal protective equipment.
Engineering Control: Closed operation.
After the computer enters the engineering control software, it can be powered on.
Engineering Control: Closed operation.
(c) the use of adequate engineering control measures;