Examples of using Value engineering in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
AI and Value Engineering.
VA/VE stands for Value Analysis/Value Engineering.
Our Value Engineering Service.
The Board conducted a review of the value engineering programme.
The value engineering studies comprised three phases:(i) preparation phase;(ii) workshop phase; and(iii) post-workshop phase.
This will require extensive value engineering and negotiations;
Infosys is able to bring its cross functional andtechnical expertise in providing value engineering services.
As a result of the risk assessment, a value engineering review of the General Assembly Building was undertaken.
Specify in the cost estimate the fees relating to the value engineering programme.
The changes made as a result of the value engineering exercise did not adversely affect the overall building performance, aesthetics or functionality.
Such factors should not be included in or confused with the value engineering exercise.
The cost savings identified through value engineering were welcome, but value engineering must not be allowed to compromise the quality of the work.
Paul District employeeAdéle Braun as the recipient of its inaugural 2012 Value Engineering"Rising Star" Award.
Moreover, the value engineering exercise currently under way would reduce the costs of the project, which should and could be carried out within the approved budget.
Now, the majority of orders originate from professionals who source parts for larger,high value engineering projects.
At the same time, Katsuyoshi Ishihara introduced the Value Engineering principles used to describe how a product and its components work.
To achieve these goals, everyone in the organization had to learn thebasics of techniques like statistical quality control and value engineering.
This process encapsulates technical design reviews,buildability assessments, value engineering, safety-in-design reviews and risk assessment.
The requests concerning value engineering contained in General Assembly resolution 63/270 should be addressed in the forthcoming progress report on the capital master plan.
In many cases,we can integrate sustainability with project value management, value engineering and whole-life costs.
The value engineering noted in the report ensured that construction costs would not exceed $7.5 million; a contingency of approximately $800,000 had been maintained.
The Group also welcomed thecost savings of some $100 million identified though the value engineering exercise and supported the continuation of the exercise.
The Advisory Committee also requested that the Secretary-General specify in the costestimate of the project the cost of the fees relating to the value engineering programme.
Through our Value Engineering Service we advise our clients in the optimization of their investment, assisting them in the prepararation of their Project's Technical Specifications.
Product analysis includes techniques such as product breakdown, systems analysis, requirements analysis,systems engineering, value engineering, and value analysis.
Value engineering incorporated into the design of the project before the previous progress report lowered the projected cost to $1,974.2 million, with a reduced budget deficit of $97.5 million.
The Board recommends that the Administration specify in thecost estimate the cost of the fees relating to the value engineering programme, as well as the total cost of all the studies relating to the project.
In paragraph 28, the Board recommended that the Administration specify in thecost estimate the cost of the fees relating to the value engineering programme, as well as the total cost of all the studies related to the project.
The current popular procurement cost control methods include supplier quantity decision, procurement authorization,VA/VE value analysis method/value engineering method, four-quadrant classification method, and procurement standardization.