Examples of using Load testing in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Secondary side circuit load testing.
And viral load testing is not the best idea about HIV research.
Secondary side circuit load testing.
But the Viral load testing is a very important resource when we talk about the treatment of person living with HIV!
The workmanship of the product is top notch and exceeds our load testing.
In its simplest form, load testing involves applying a load to a structure or piece of equipment.
Additionally: Measuring instruments for tightness testing, load testing and serviceability testing.
Data at rated parameters shall be read out during no load testing of the transformer, traditional manual voltage regulation and data reading way costs waste time and labour, which are also inaccurate.
LoadUIWeb is a free desktop tool for performance, stress,scalability and load testing of web applications free download.
When load testing some marine cranes we will load the crane to 125% of the rated load for that radius and, if there's a catastrophic event, one doesn't want to be in close proximity of the hook,” he said.
The original tension load cell has been serving the load testing and force or weight measurement industries since 1979.
Appropriate static anddynamic arch parameters of these two big arch bridges, as obtained during load testing, are compared.
Supply LLC offers a myriad of rigging services,including inspection, load testing and critical lift consulting for Industry leaders across the state.
The Radiolink plus-a 50t version will be on show-is primarily used in weighing,load monitoring and load testing applications.
By slowly bringing all relevant processes, like load testing and commissioning, in-house we are not only able to offer customers a more competitive price, but we gain greater control over the quality of service and workmanship.
The original digital dynamometer tension load cell has been serving the load testing and force or weight measurement industries since 1979.
A revolutionary new piece of software from Straightpoint provides real time data, reports andcertification related to wireless monitoring at a safe distance during non-destructive load verification or proof load testing.
In order to achieve this, and in addition to numerous practical installation tests,complex quality and load testing is carried out by the German Association for Material Research and Testing Institute for Buildings.
The Test Engineers design and build our customized test tools, designing automated tests, andcarry out functional testing, load testing, and usability testing. .
The use of RTS for measuring displacements at the Sava railway bridge during load testing after bridge rehabilitation is presented in the paper, and a special emphasis is placed on the determination of displacements when the bridge was subjected to dynamic load and natural frequencies.
They are used in applications such asdynamic brakingandload bankingforlocomotivesand trams, neutral grounding for industrial AC distribution, control loads for cranes andheavy equipment, load testing of generators and harmonic filtering for electric substations.
Wirelink plus is designed to be rigged with Crosby standard shackles- manufactured from aerospace grade aluminium andutilising an advanced internal design structure this range of non-indicating Load cells are extremely light weight, easy to handle and are used worldwide in an array of industries for lifting, pulling, proof and structural load testing.
Stack Runner empowers an execution analyzer to make Vusers(Virtual Users)to put intense load on the servers concerning diverse execution testing methods like Load testing, Stress testing, Endurance testing, Volume testing and so on.
Straightpoint already provided a series of software products, including a wireless centre of gravity tool, multiple wireless control system and desktop controller, but the Proof Test plus(or SW-PTP) is a tailored technology specific to load tests, compatible with the manufacturer's force measurement, load monitoring andsuspended weighing load cell equipment that is utilised for load testing in the field on a daily basis.
Sewage treatment facilities newly built, extended or reconstructed objects shall be subject to acceptance into operation after hydraulic testing of pipelines and capacitive structures, long(not less than three days),comprehensive testing under load on a clean or waste water, and after checking the interaction in all the facilities.
The Loadblock Plus is a low capacity, self-indicating compression loadcell,used in many testing and load monitoring applications worldwide.