Examples of using Construction area in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
The construction area will be 272m2.
The whole region(mosques) as the construction area.
Permitted Construction area: 250m2.
Construction area: HOUSE; 105,275 m2.
A2 Ecological rating per m2 construction area.
The construction area totals 298m2.
Pool on 2 floors with a construction area of 205 sq.
Total construction area: Between 151m2 and 300m2.
The second house(to rebuild) has a construction area of 257 m2.
Total construction area: from 87 m2 to 117 m2.
The new sitewill be part of the"A5 Quarter" construction area in Kronau.
The construction area is categorised as seismic zone S2.
Section 1 contains the construction area 3 with taxiway D 3.
Construction area: 293 sq. m. Build: 2000 to its highest standard.
All plots with a construction area of 205 sq. m.
Placement is made back to back, which are glued construction area tape.
Total construction area: approx 132m2 5 minutes driving time to the motorway A8.
Close up of two beardedmen in protective helmets working together in construction area.
Total construction area: 276 m2 7 minutes driving time to Lourinha and Peniche.
Total construction possibility: 138m2 Possibility to increase construction area.
Total construction area: approx. 380m2 5 minutes driving time to S. Martinho do Porto beach.
Another task was thelarge-scale re-routing of the many power lines in the construction area.
The construction area is busy every time the economy accelerates, regardless of the industry.
The company covers an area of 20000 square meters, construction area of 12000 square meters, and more than 200 employees.
Plot of land for sale, with a total area of 824 m2,where construction is allowed with a net area of 222 m2 and construction area of 444 m2.
Available for the construction area is large enough, so that is where the imagination run wild and experiment.
Set in a quite and pleasant area, the villa is on a plot of 530 m2 and has a construction area of about 300 m2 and individual swimming pools.
The land is located in the construction area of the settlement, it is possible to build residential or commercial facilities.
Several residential types are partly combined at one construction area but arranged as separate buildings so that even division in smaller parts is thinkable.
The area of factory is over 10000㎡ and the construction area is about 6000㎡, mainly producing Hydraulic Seals, PTFE products& Nylon products.