Examples of using Demand quantity in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Demand quantity resulting from the expected consumption.
Due to the number entered in the options,9 MRP suggestions with the demand quantity"0" are generated.
The demand quantity of the MRP suggestion is calculated in such a way that the stock is filled up to the replenishment level at least.
In a staging suggestion for a systematic warehouse transfer, the demand quantity is the variance between the stock and the trigger point.
Time on which the demand quantity of a part or a service is required that is to be procured by means of the MRP suggestion.
The MRP suggestion is generatedif the total of the current stock quantity and the coverage quantity is lower than the demand quantity.
The demand quantity suggested in the MRP suggestions does not depend on the order quantity in the MRP parameters of the part.
By changing the reservedquantity in the document line of the staging suggestion, the demand quantity is automatically adjusted accordingly.
An MRP suggestion is generated for the demand quantity that is required for filling the stock of the part up to the replenishment level.
There is a demand surplus if the stock quantity minus the safetystock is not enough to cover the demand quantity required in the MRP horizon.
The demand quantity is automatically changed in the MRP cycle if a value used to calculate the demand quantity has been changed.
The population of vegetarian are growing continuously because of the importance and advantages of vegetable protein had been proved by medical circles,so the demand quantity of tofu, soy milk, bean sprout, alfalfa machine from European and American countries are getting more and more.
If the demand quantity cannot be split into equal partial quantities, the demand quantity of a new MRP suggestion is adjusted accordingly.
Depending on how the plant order is generated,this is the demand quantity from the MRP suggestion or the demand quantity from the document which has triggered the original demand, e.g. from a work order.
Demand quantity for the difference between the release quantity of the firmed schedule of the release and the release quantity of the firmed schedule of the delivery schedule.
For instance, the demand quantity is increased when the part line has been adopted into a shipping document and the part line concerned is deleted in the shipping document.
The demand quantity of an MRP suggestion can be manually or automatically changes if no document has been generated from the MRP suggestion, e.g. a purchase order.
The demand quantity is reduced even if, in the call sales order of the document line, a JIT release is created whose release quantity is smaller than the release quantity of the finite release.
If a demand quantity is calculated for an MRP suggestion that does not reach the minimum suggested quantity, the minimum suggested quantity is used instead of the calculated demand quantity and suggested in the MRP suggestion as demand quantity.
Monitoring demand quantities in work orders order status"In Production.
These parts never create any demand quantities due to a delivery schedule.
Monitoring demand quantities in quoted orders order status"Scheduled.
Monitoring demand quantities in work orders order status"Scheduled.
Demand quantities created by the order.
The Demanded quantity of water needs to be defined on a place as at a different thickness of a layer podmazki its consistence is various.
What's new about the platform is the coordination of fluctuating production and demand quantities in an intuitive online tool.
Preliminary runs, post production,small quotas of foreign languages, demand quantities- all this is now possible.
For outer diameter not over than 63.5mm, small size hollow bar, when demanded quantity is under 5 tons, usually make cold drawn hollow bar, using larger size hot rolled hollow bar to draw to the size demanded. .
The premise Intended under facingis necessary for marking preliminary to define demanded quantity of sheets, their sizes on width and length, the sizes dobornyh sheets, an installation site of a skeleton and stoppers or djubelej for its fastening.