Examples of using External tests in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Available external tests sorted by graphic card.
Publication of the overall results of external tests.
Available external tests ordered by the display format.
Lucky"baywatchers" are asked to conduct"external tests" of local"software.
Certifications, external tests and seals of approval from independent organizations confirm this claim.
Visit our Top 10 Subnotebooks and our External Tests for more information.
Both internal and external tests ensure compliance with all data protection relevant processes at Körber.
Semi-annual course objectives are defined, and in-school or external tests are prepared on request.
Both internal and external tests assure adherence to all processes relevant for privacy protection at AMF-Bruns.
The Sniper's entire skill tree has been reworked to include PvP feedback from internal and external tests.
Both internal and external tests ensure compliance with all data protection relevant processes at DQS CFS GmbH.
If it is additionally requested ornecessary for capacity reasons, external tests can be carried out at well-known institutes.
In addition, external tests have been done at an independent laboratory to confirm the functionality of the system.
Use of the filling materials guideline for mandatory external tests of filling materials as part of the certification is possible.
If required, we design individual testing setups for you,carry out further testing methods or support you in case of external tests.
Both internal and external tests ensure compliance with all data protection relevant processes at UNITED GRINDING.
Academically, all private schools must lead their students to the ability to attain standardized,government-provided external tests such as the Abitur.
Norway: External tests introduced in 2004 are set in September for pupils of the fifth and eighth years of compulsory education.
We are not only internationally certified in accordance with ISO 9001:2008, but we also regularly test our suppliers, have ourown quality control service and have MME come in and carry out external tests too.
External Tests(by customers) Some of our products are customized solutions developed for various applications and operating conditions.
The results of the supervisory visits as well as external tests made on pipe and fitting samples are confirmed to aquatherm in test certificates.
Besides the education within the school in the areas of standardisation and guideline systems as well as expert and assessment business,they also represent qualified contacts for external tests in the respective fields of expertise.
In addition to complex internal and external tests before the product launch, which by far exceed the minimum standards, we also closely monitor our products and constructions in practice.
Austria: As of 2005, external tests held for samples of pupils for monitoring the education system have progressively been introduced in the years four and eight of compulsory education.
These inspections are supplemented and confirmed by regular external tests, by such organisations as the Federal Institute for Materials Research and Testing(BAM), the Underwriters Laboratories(UL), TÜV or DVGW.
Three transformer balancedinputs PROGRAM/ PRIORITY/ 22 kHz external TEST.
All tests relevant to the fabrics can be executed either in our inhouse laboratory or by independent external test laboratories.
The device is available with aserial interface which can be connected to an external test controller or an integrated controller with an Ethernet TCP/IP and an EtherCAT interface.
To ensure that you have a nice experience in using our controller, we adopt the newest test standard EN62109-1,62109-2 and quality management system of ISO9001 for internal and external test to control quality.
ON BOARD: Per channel three symmetrical audio inputs PROGRAM/ PRIORITY(input with separate volume control for priority signal,independent of the master control)/ TEST 22 kHz, external test input, can be used as 3rd audio input.
