Examples of using Layer should in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
The top layer should be spinach.
In the intervals formed poured concrete grade M-300, the layer should be slightly higher than the rails.
The layer should be thick spruce about 15 cm.
To reduce the risk ofleaks when laying the materials in several layers, each layer should be laid offset from the previous one so that the joints are not directly over each other.
This layer should be moist, but not soaking wet.
To ensure its reliability, should increase the fortification pass, at least not less than three fortifications,additional waterproof layer should be attached to consider the effect of insulation at the same time,should use the porosity of the foam material, but also conducive to drainage to find slopes.
Every layer should be dried in a convection oven.
The first layer should not be strongly thick.
This layer should also transport moisture to the outside through incorporated membranes or zips.
The waterproof layer should be protected after construction.
This layer should keep plasticity more long time as the carving will be just put on this layer. .
When necessary, waterproof layer should also consider the anti-aging, puncture and bird destruction.
This layer should allow the secure exchange of certified messages, records, forms and other kinds of information between the different systems.
This felt layer should be wiped never, never!
The bottom layer should be made of breathable material, so that it can help to remove moisture in time and keep dry and fresh.
The first layer should be thermal underwear.
Important: Each layer should be applied in the same direction, but with each successive must be positioned perpendicular to the previous one.
In addition to transporting data, this layer should also handle specific security requirements such as electronic signatures, certification, encryption and time stamping.
The top layer should always consist of apples.
ID authorization middle layer should have all the privileges attached to the end user to perform operations necessary to end users.
The Supporting layer should not lag behind the second at all,that is between layers should not remain empty space.
In wet soils second layer should be only rubble, concrete block in such a case is not applicable due to its ability to absorb water and swell.
The layers should be placed as follows Text layer above the drawing.
Layers should contain a pixel in order to prevent errors in the data interpretation.
Both layers should be made of bitumens modified with SBS polymer.
A safe andlong-term storage of highly radioactive waste in deep geological layers should be achieved by a multi-barrier concept consisting of geological, geotechnical and technical barriers.
For technical reasons,high-layered rigid-flex PCBs with numerous flexible layers should always be constructed symmetrically.
The layers should be as thin as possible and be cured separately under the UV lamp.
That the second layer of a solution did not slip with earlier seized, put layers should be thin.
Make sure your fries are mixed well during shaking-lower layers should come on top and vice versa- so that you will achieve even results.