Ore processed grew 4.7% to 23,677 tonnes;
Oriole accounted for about 8% of the ore processed during the period.
Ore processed increased 18% to a record 335,199 tonnes.
San Ignacio accounted for 58% of the total ore processed at the GMC in 2016, compared to 48% in 2015.
Ore processed rose 16% to a quarterly record of 89,030 tonnes.
Gold production decreased8% to 5,177 gold ounces("Au oz")- Ore processed decreased 7%, with 82,456 tonnes milled.
Ore processed increased 33% to a quarterly record of 92,574 tonnes.
Average cost per ounce silver equivalent(55:1 Ag: Au)during start up in 2010 was US$18.40 and cost per tonne of ore processed was US$13.
Ore processed in 2016 increased by 4%, which partly offset the lower silver grades.
Average cost per ounce silver equivalent(55:1 Ag: Au) during the first quarter of 2011 was US$11.30 andcost per tonne of ore processed was US$12.70 which is within range of the operations budget.
Ore processed grew 10.5% to 22,612 tonnes(all ore milled i s now from the Rosario M ine);
Processing costs for the concentrator are, on average over the life of mine $239. 37 per tonne of concentrate produced, based on yearly averageprocessing cost s of $33.66 per tonne of ore processed.
In the fourth quarter of 2014, ore processed at the GMC increased 38%, to 76,839 tonnes compared to the same period in 2013.
Total ore processed during the third quarter of 2014 was 39,571 dry tonnes compared to 37,630 dry tonnes during the third quarter of 2013, an increase of 5.
The effect of lower than anticipated production and the lowergold price has to some extent been mitigated by a reduction in the cost per tonne of ore processed, which has been achieved by a combination of oxygen injection into the CIL process, greater attention to cost control and the devaluation of the South African Rand against the US dollar.
Ore processed at Topia increased 4% to 16,983 tonnes when compared to the corresponding quarter in 2013, and decreased 2% when compared to the second quarter of 2014.
In the fourth quarter of 2014 ore processed at Topia increased 12%, to 15,735 tonnes, compared to the corresponding quarter in 2013.
Ore processed in the first quarter of 2017 increased by 12%, compared to the first quarter of 2016, partly offsetting the lower head grades and gold recovery. GMC Operations Summary.
The cash production costs per tonne of ore processed in Q1 Fiscal 2018 at the GC Mine increased to $55.93 from $49.10 in the prior year quarter.
Total ore processed during the third quarter amounted to 641,345 tonnes milled, representing a slight decrease of 4% over the previous quarter due to the effects of two major hurricanes which struck Mexico during the quarter combined with a break-down of the third ball mill at the La Encantada mine, which has since been repaired.
Correspondingly, cash production cost s per tonne of ore processed in Fiscal 2017 at the GC Mine decreased by 13% to $46.83 from $54.02 in the prior year due to the decrease in both per tonne cash mining and milling costs.
When including ore processed from Fire Creek, the Midas mill's daily average processing rate peaked at 772 tons per day during the third quarter of 2015.
Correspondingly, cash production cost per tonne of ore processed at the GC Mine was $44.43, a decrease of 17% compared to $53.38 in Q3 Fiscal 2016 as a result of the decrease in both per tonne cash mining and milling cost.
Guanajuato Mine Complex Ore processed at the GMC, which includes San Ignacio, in the third quarter of 2014 was a record 72,047 tonnes, an increase of 19% compared to the same period in 2013, and a 13% increase compared to the second quarter of 2014.
Correspondingly, cash production cost s per tonne of ore processed in Q4 Fiscal 2017 at the Ying Mining District was $64.34, a n 11% decrease compared to $71.90 in the prior year quarter due to the decrease in both per tonne cash mining and milling costs.
Beginning in May all ore processed through the milling facility is from the Rosario Mine only and management is not planning on processing third party ore until the third ball mill is commissioned, bringing milling capacity to 700 tpd.
With respect to the fourth quarter production results, total ore processed at the Company's three operating silver mines, the La Encantada Silver Mine, the La Parrilla Silver Mine and the San Martin Silver Mine, amounted to 565,003 tonnes milled in the quarter representing a 7% increase over the previous quarter.
C ash production cost per tonne of ore processed at the Ying Mining District in Fiscal Q 3 2017 was$ 68.22, a decrease of 4% compared to $7 1.29 in Q 3 Fiscal 2016 as a result of the decrease in both per tonne cash mining and milling cost s.
Correspondingly, cash production cost per tonne of ore processed in Q1 Fiscal 2018 at the Ying Mining District was $66.93, an 1% increase compared to $66.27 in the prior year due to the increase in per tonne cash mining offset by the decrease in per tonne milling costs as discussed above.