Examples of using Substrate must in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
The substrate must not remain wet.
Limbers: No grower wants to orient his methods to the growing medium, the substrate must instead be adapted to his ways.
The substrate must be flat and hard, e. g.
For wood flooring work foundations will be more-check the strength of the boards themselves and their attachment to the joists,Shpatlevanie slots(the substrate must be airtight), humidity control(for the tree- a maximum of 10%) and again purity.
The substrate must be clean, free of grease and dry.
Reliable adhesion to the substrate must be ensured even in conditions of extreme loads.
The substrate must be clean, dust-free, dry and level.
The level of hold between the coating and the substrate must be greater than the hold between the adhesive tape and the coating.
The substrate must be dry, clean, solid, evenly absorbent and smooth.
Prior to application, the substrate must be cleaned and freed of all traces of oil and grease.
The substrate must secure the success of the respective crop.
The substrate must be dry and free from grease and dust.
Inspect production materials: all these glass substrate must be high quality and have transparent appearance, no bubbles, no scratches, no mildew spot, etc.
The substrate must be clean and dry, homogenous and even.
For thegrower, the substrate must also react to a number of other factors.
The substrate must stick surely, so that plaster does not become detached before time.
Good to know: The substrate must be firm, sound, level and free of oil, grease, dust and penetrating cracks.
The substrate must be fixed on the perimeter and the diagonals, so as not slid.
Actually, as far as the plant is concerned, the substrate must hold water, oxygen and nutrients, drain correctly and remain neutral so that it does not interfere with the development of the plant.
The substrate must be clean, dry and free of cement bloom, dust, oil, grease and other adhesion-reducing dirt.
The substrate must remain dry, firm, load-bearing and even.
The substrate must be clean, dry, free of grease and oil.
The substrate must be dry, firm, free from dust and must be loose parts or separating agents e.g..
The substrate must be checked for possible moisture, using a CM moisture meter, for instance.
The substrate must be sound, surface-dry, absorbent, frost-free and free from dirt.
The substrate must be dry, firm, clean and free from release agents formwork oils, grease or similar.
The substrate must be at least 10 cm deep so that the root system can spread properly.
Primed substrate must dry for about 12 hours, so this work is best done closer to the night, so as not to waste time waiting.
The substrate must be prepared by grinding, milling or shot-blasting until it is sound, dry and free of loose or adhesion-reducing particles.