Examples of using Test transformer in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Long term test transformer 45 kV, 20 KVA.
It should also be noted whether the capacity of the test transformer is appropriate.
The test transformer should be kept clean frequently.
It is difficult to make other test transformers without partial discharge.
The test transformer should be kept clean frequently.
The corona discharge is generated in the conductive portion of the test circuit at a high potential, such as the flange of the test piece,the metal cap, the test transformer, the end of the coupling capacitor, and the tip portion of the high voltage lead.
The test transformer should be wiped clean before use.
According to the requirements of the test sample,first select the appropriate voltage with the test transformer, so that the test transformer high voltage side rated voltage Un higher than the test product of the test voltage Us, that is Un> Us.
Test transformers are used in various applications for generation of high voltage.
When there are many equipments and the test transformer has a small capacity, the test can be carried out in batches.
Test transformers are designed to generate high alternating voltages for testing and measuring purposes.
The weight and volume of the equipment are greatly reduced. In the series resonant power supply, not only the bulky high-power voltage regulating device andthe ordinary high-power power frequency test transformer are omitted, but also the resonant excitation power supply only needs to test the capacity of 1/Q, so that the weight and volume of the system are greatly reduced, generally 1/10-1/30 of the common test device.
According to the test transformer output rated current and rated voltage, can determine the capacity of the test transformer, Ie P UnIn.
The Test Transformer calls the booster, it is the basictest equipment used by the power station, supplying and distributing the electrical power system and the scientific research unit.
Connecting the control unit(it is the supplementary equipment of test transformer, detailed see the explaining book) with work frequency 220V(above 10KVA with 380V),adjusting 0-220V/380V voltage input to HZQ(YQ-JZ) test transformer primary winding through autotransformer.
Dry test transformer completely changed the old-fashioned test transformer stupid, large, heavy backward conditions, and can be installed in supporting the production of high-pressure silicon stack can provide DC high-voltage test power, with control box(Taiwan), automatic protection micro-security Table, ball gap and other ancillary equipment, especially for on-site testing, so heavy work becomes convenient, fast, easy and flexible, greatly improved efficiency.
This set of test system consists of a test console,an inflatable no partial high voltage test transformer, a coupling capacitor and protection resistor, a set of isolation filter, the whole system has complete overvoltage, overcurrent protection and reliable, With the characteristics of small interference.
Select the test transformer, the main consideration the following.
EPRO Gallspach's oil insulated test transformers are proven over decades and same as all other equipment they offer highest lifetimes of several decades.
Capacity, according to the test transformer rated current, rated voltage and the formula P UnIn determine the capacity of the test transformer. .
The tested transformer shell and non-pressurized winding should be grounded reliably.
The AT testing machine was made for testing transformers and other components within a production or goods reception area, quickly, precisely and reliably… read on.
Additionally available software modules make it more convenient to perform complex test and evaluation procedures such as testing transformers, arresters, and generators.