Examples of using Second train in English and their translations into Hindi
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
We got on the second train.
The second train too will be identified soon.
What is the speed of second train?
On the second train, the militants fired indiscriminately.
Find the length of the second train?
The route for the second train will also be identified soon.
And then you need to get home from the second train.
Length of second train= 80 m.
If the speed of the first is 60 km/h, then find the speed of the second train.
If the second train covers 400 km in 4 h, find out the speed of the first train. .
I left him on the second train.
If the second train is moving at 30 km/hr, at what speed is the first train moving?
If the speed of the first train is 65 km/hr, then find the speed of the second train(in km/hr)?
If the second train runs 400 kms. in 5 hours, then, find the speed of the first train. .
At railway level crossings,wait for the boom to rise and bells to stop before you cross- a second train may be approaching.
If the second train runs 400 km in 4 hours, What is the the speed of the first train? .
The speed of 2 trainer in the ratio of 6:7 if the second train runs 364 km in 4 hour in the speed of first train is.
The second train at the Yamal LNG plant started its operation in August 2018, and LNG production from the plant has been expanding steadily.
At railway level crossings, wait for the boom to rise,warning lights to stop flashing and bells to stop before crossing- a second train may be approaching.
At what speed does the second train B travel if the first train travels at 120 km/h per hour.
The second train was initially earmarked for the Northern Railway, but had now been alloted to the Southern Railway, the official said.
Commissioning of the second train took around three months, from when the compressor gas turbines were first fired up, although the commissioning period is not clearly defined.
Which train has second highest number of passengers?
The second private train will soon be run on the Mumbai-Ahmedabad-Mumbai sector.
Yamal launched its second LNG train in August with an annual capacity of 5.5 million tonnes.
The first gas input into the second LNG train occurred on 21 July and is now operating at its rated nameplate capacity of 5.5 million tpy.