Print in two passes with intermediate drying ; Stampa: in due passaggi con essiccazione intermedia ; Fast intermediate drying and minimal residual stickiness. Essiccazione intermedia rapida e bassa tenacità residua.The main parameters affecting the intermediate drying . I principali parametri che influenzano l'essiccazione intermedia . Fast intermediate drying and minimal residual stickiness; Rapida essiccazione intermedia e minimale vischiosità residua; The ability to print wet on wet without intermediate drying ; La capacità di stampare bagnato su umido, senza essiccazione intermedia ;
After intermediate drying , the colour turns to a milky-opaque. Dopo l'essiccazione intermedia , il colore della stampa diventa latte-opaco. When multi-color printing application, the intermediate drying depends on the design. Con la stampa multicolore, l'uso di essiccazione intermedia dipende dalla progettazione. Infrared IR intermediate drying screen printing, Light series. Essiccazione a raggi infrarossi IR intermedia serigrafia, serie Light.a bottom of preparation in brown color 2 times with intermediate drying . un fondo di preparazione in colore marrone 2 volte con essiccazione intermedia . The use of an intermediate drying is necessary when using a dye as a substrate; L'utilizzo di essiccazione intermedia è necessario quando si usa la vernice come substrato; raster designs without intermediate drying (wet-on-wet). raster senza asciugatura intermedia (wet-on-wet). Avoid excessive intermediate drying temperature to prevent possible migration. Evitare un'eccessiva temperatura di asciugatura intermedia per evitare possibili migrazioni. manufacture from it pass papers in a continuous mode, without intermediate drying . fabbrica da lui tappezzi passaggio in regime continuo, senza susheniya intermedio . After an intermediate drying time of 4 to 6 hours, another coat should be added. Dopo un tempo di essiccazione intermedio di 4-6 ore, si applica una seconda mano. 3 varnish coats with intermediate drying , an oshkurivaniye an emery paper No. 3 soprabiti di vernice con essiccazione intermedia , un oshkurivaniye una carta di smeriglio no. which cause a wide spatula in two layers with intermediate drying for 4-24 hours. che causano una grande spatola in due strati con essiccazione intermedia per 4-24 ore. Dewatered sludge can be dried without intermediate treatment. It has features intermediate between dry skin and fat. Ha caratteristiche intermedie tra la pelle secca e quella grassa. Number of solutions(dry, intermediate and wet) for the Superbike class: 5 front and 9 rear. Numero di soluzioni(asciutto, intermedia e bagnato) per la classe Superbike: 5 anteriori e 9 posteriori. Whether they were Wet, Intermediate or dry tyres he was always one of the fastest drivers on track, Sia che fossero da bagnato, intermedie o da asciutto è sempre stato uno dei piloti più veloci in pista,
Display more examples
Results: 20 ,
Time: 0.0415
In the HIL-10 machine an intermediate drying zone for partial flash-off of the solvents is provided.
Primer effectively isolates the repair surface for further coating of paint, with intermediate drying is not required.
This intermediate drying step typically involves heating to at least 150° C., which results in increased costs.
In Wet-steam process is continuous process without intermediate drying and useful for qualities with high possible liquor pick-up.
In many cases it is also possible to work wet-in-wet where by intermediate drying operation can be omitted.
We may repeat the application process with an intermediate drying time of 8hrs and soft sanding between coats.
Two spray applications (with 5 to 10 minutes intermediate drying time) are needed for an even paint film surface.
This is followed by the intermediate drying stage before the third painting stage, the base coat as color application.
Compared with conventional painting processes, this could reduce energy consumption by 15-20% as the intermediate drying process is eliminated.
Immediately after the start of the intermediate drying period, the control operation is performed through Steps S6, S7 and S9.
Show more
Ideale per supporti di stampa, come ha una breve essiccazione intermedia e la viscosità debole.
Totale deve essere applicato almeno 5-6 strati di terreno con essiccazione intermedia ciascuna.
Nei legni molto porosi, applicare 2 mani di fondo con essiccazione intermedia di 4 ore.
Tutte le operazioni successive alla vernice prodotta con essiccazione intermedia di ogni strato.
Prodotti di questa serie differiscono rapida essiccazione intermedia ed indurimento ad una temperatura di 149 °C.
Applicare sempre due mani di prodotto con essiccazione intermedia di 24 ore.
Essiccazione intermedia dotata di potenti lampade IR che operano in modalita pulsata (avvio rapido), controllata da un timer.
Dal forno ad un sistema di essiccazione intermedia ad una macchina tampografica di base.
Totale necessità di applicare due o tre mani di ogni colore con essiccazione intermedia e oshkuryvanyem.
5.
Il tempo d essiccazione intermedia fra le singole mani deve essere al minimo 4 ore.