Examples of using Second value in English and their translations into Japanese
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
The second value to compare.
If the first value is less than the second value.
The second value will be ignored.
First value is the part's id. Second value is the page.
If the second value is omitted it is copied from the first.
The Oracle database's execution plan only shows the second value.
However, the second value not far from the truth.
We can see it as quantity or quality and we refer to this second value.
The second value is a file descriptor of the master pty.
If only one value is used, the second value is presumed to be center.
The second value is the total number of contacts(not records.
If only one value is used, the second value is presumed to be center.
The second value in the header, the carrier period, is scaled and stored away.
This is often convenient to distinguish the second value in a given context.
The second value alters the retransmit counter, which defaults to 11 retransmissions.
If the first value is a number, the second value also has to be a number.
However, when a second value is provided, it is treated as the number of milliseconds to move to that new value. .
If only one value is specified, the second value is assumed to be‘center.
The optional second value is specified in seconds and may use any of the units documented in the TIME FORMATS section of sshd_config(5.
If the first value is a string, the second value also has to be a string.
Using the"R" standard format string to return a result string that displays all the significant digits of each Double value shows that the second value is.
If only one value is specified, the second value is assumed to be‘center.
Returns the first value if it isn't an error, otherwise returns the second value. Learn more.
The Oracle database's execution plan only shows the second value. The PostgreSQL explain command has two options.
Boundaries is a vector of pair of two size_t s, where the first value of the pair is the byte of the string where the part starts, and the second value is the length of the part.
The first value that can be parsed as a time is assigned to the transition-duration, and the second value that can be parsed as a time is assigned to transition-delay.
In this example, the first value is for"cat" and the second value is for"dog.
Switch( Slider1. Value, 20,"Result1", 25,"Result2", 30,"Result3")The slider's value matches the second value to be checked, and the corresponding result is returned.
The lead time preparing determines how many seconds will start before the end the freeware to bid and the second value Bid decides when the bid is finally sent.
In each pair of the form(time position, target), the first value is a percentage of the period of the contained text(a number followed by"%") and the second value is the value of the pitch attribute(a number followed by"Hz", a relative change, or descriptive values are all permitted.