Examples of using Main pipe in English and their translations into Malay
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
Engine Main Pipe.
The main pipe and the end of the water pipe are blocked with a plug.
Push the directional valve handle back, grease supplied by main pipeⅡ.
The main pipe of the different diameter tee has the same size, and the….
The aorta of a whale is larger in the bore than the main pipe of the water-works at.
The main pipe laying along the width of the greenhouse 32mm or more specifications.
And the lubricating grease flows through main pipe line A while pulling out the button of directional valve.
The main pipe and the drip irrigation pipe interface connected with tee junction.
The pressure control valve is installed on the main pipe within 1 meter from the pressure switch/ pressure control valve⑤.
The main pipe onto which the branch connection is welded is usually called the run or header size.
Differential pressure switch/ pressure controlvalve is generally installed at the end of the main pipe line where having the maximum pressure loss.
The main pipe of reducing tee has same size, but the size of branch pipe is smaller than the main pipe.
The grease in the lubrication pump is powered to grease main pipe alternatively by way of divider valves, the lubricating grease is transported to each divider valve,[…].
The main pipe of the reducer tee has the same size, and the pipe take-up size is smaller than the pipe head size of the main pipe.
Injection system: including main pipe, blowpipe, pulse valve and control instrument.
Electric ring system can also be arranged secondary distribution, pressure control valve installed in the returnvalve from the hydraulic port within 1 meter on the main pipe line.
Another main pipe any state pipe I and pipe I I were unloading in communication with the oil reservoir.
The hydraulic directional control valve 1ahas the function of switching the two oil supply main pipes and controlling the pressure at the end of the main oil supply pipe. .
RM400 million to upgrade water supply infrastructure in selected Felda areas,besides RM50 million to connect the reticulation system in estates to the main pipes.
The main pipe of the different diameter tee has the same size, and the pipe size of the branch pipe is smaller than the pipe size of the aluminum Alloy Tee main pipe. .
In the case of a long pipe between the lubrication distributors(2) and(3), the pressure control valve(6) is used to fully ensure the operation of the lubrication distributor(3)so as to increase the pressure of the main pipe line.
The main pipe of the different diameter aluminum equal tee has the same size, and the pipe size of the branch pipe is smaller than the pipe size of the aluminum alloy tee pipe. .
As you can see, the pipe change is completed by the directional valve 6, when the valve handle pulled out,the grease is discharged from the main pipeⅡ, when the valve handle forward, the grease is discharged from the main pipeⅠ.
Once the pressure difference between the two main pipe up to 3.5~ 4.5Mpa, the piston IS to overcome the spring force to the right(left) movement, so that the travel switch contact closed, the signal to control the solenoid valve to switch, the reverse movement to complete a cycle of work.
While starting the pump, the solenoid“a” power on and in a magnetization condition, the grease or oil from the pump output was transferred by the A port to thegrease/oil main supply pipe L1, main pipe L2 is still open to the grease/oil reservoir.
YKQ Pressure indicator used for grease centralized lubrication system,installed in the front or end of the main pipe to check the pressure condition inside the main pipe, when the main pipe pressure reaches the presetting value, the electrical control box sends electrical signals, control directional valve to switch or monitoring the operation of the lubrication system.
MSS SP 97 buttweld sweepolet is a kind of carbon steel sweepolet Branch Connection fittings are fittings whichprovide an outlet from a larger pipe to a smaller on The main pipe onto which the branch connection is welded is usually called the run or header size The pipe to which the branch or outlet size Branch….
The central pump transfers the grease to about 50mm diameter of main pipet,and then sent to each secondary pipe in different area by this main pipe, through the open and closed of the solenoid valve installed on the secondary pipes to transport to intermittently grease to the lubrication distributor of the working section and then to each lubrication point.
The changing of grease pipe is switched by manually reversing lever to achieve their goals, when the reversing lever is rotated to a positioning hole,grease the main pipe feeding grease II, when the reversing lever is rotated to a different set of people bit hole, I grease through the main pipe feeding grease.
The connection of pump tubing and junction with the main piping system should be closely, without leakage, not allowed to use flax oil aids.
