Examples of using Cargos in English and their translations into Polish
{-}
-
Official
-
Colloquial
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Financial
-
Official/political
-
Programming
-
Computer
Our good package and loading the cargos.
Customer pick up cargos from airport/seaport.
They can be used for carrying bulk cargos.
A: Sample or LCL cargos: full payment before delivery.
protect cargos perfectly;
FCL cargos: T/T,
Trucks, and 20 different cargos to transport.
Cargos leading time must finish before clients needs.
Q3. Is it possible to inspect the cargos before loading?
Cargos leading time must finish before clients needs.
Full-way tracking the cargos for you before the goods arrive.
Cargos leading time must finish before clients needs.
vehicles and cargos.
People and cargos have to get a shower before entering into the clean area.
A: Yes, all customers are warmly welcome to inspect the cargos before loading.
Palletless handling cargos in a unit by utilizing a cheap slipsheet.
dangerous cargos.
Organise the ships with red and yellow cargos and direct them into port to unload.
potentially reducing duplication for people drawing vehicles with cargos etc.
It carries different cargos of different pallets by adjusing the distance between fork and cargos. .
While the quarantine remains in effect, we are hopeful that adequate procedures can be developed for international inspection of Cuba-bound cargos.
Turnaloads not only can be used for holding cargos, but also be used for forking goods with pallet.
If you have some cargos need to ship recently, please double check and don't load more cargos on the vessel of Hanjin.
X2 standard model CAMC cargo truck(20T) is quite suitable for medium and long distance transportation for cargos and goods.
If you also have some cargos on the vessels of Hanjin, please keep following closely about the relevant developments;
please place the order in advance to make sure the cargos can be shipping before Jan 20,2017.
Integrate different customers' cargos and supply one-stop CFR services,
such as the KRONE Isowall movable bulkhead, it is possible to transport different cargos in various temperature zones too with no problems at all.
For full cargos, a technical note indicating the saltwater draught on arrival
We allow quality claims within 45 days after the cargos arrive at the destination port against third-party inspection report.