Examples of using The formwork in English and their translations into Polish
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Financial
-
Official/political
-
Programming
-
Computer
Set the formwork, concrete is poured.
Training in setting and striking the formwork;
How to make the formwork- a guide to action.
The formwork should be no cracks or gaps.
At the initial stage the formwork assembly is used.
Forged socket bars can be nailed directly to the formwork.
Prepare the formwork for the floor and pour concrete.
To add the width of the margin on the formwork 5-7 cm.
After that, the formwork must be made of plywood or old boards.
These access systems are designed to make the formwork easy to operate.
Prepare the formwork for walls, armiruem it and fill it with concrete.
After drying cushion(approximately 3 days),you can install the formwork.
After 7 days remove the formwork- the foundation is ready.
It should be clear space under the walls and pave the formwork.
Observe distance from the formwork of 50 mm and a pitch of 400-600 mm.
Concrete slabs can be poured with your hands on the formwork 20 cm thick.
To manufacture the formwork can be second-rate or slate boards.
After the completion of works on the foundation base dismantle the formwork.
It guarantees minimal contact with the formwork and excellent concrete flow.
The formwork is removed only after complete solidification of the solution.
Walls can impose the old brick or make the formwork and pour concrete wall.
Note that the formwork is installed on three sides of the future garage.
After removing the formwork, the void is filled with sand and rammed his stick tightly.
If you decide to make concrete,while preparing the formwork for walls and poured concrete.
When the formwork is filled with a solution, take the rule and smooth the surface.