(b) The project is no longer included in the ten-year network development plan;
The first 10-year network development plan(TYNDP) 19 forms a solid basis to identify priorities in the electricity infrastructure sector.
Under the common position, ENTSO adopts an indicative 10-year network development plan.
The 10-year network development plan drawn up by the ENTSO-G and supervised by ACER is a fundamental tool to identify the required investments needed at Community level.
Under the common position, ENTSO adopts an indicative 10-year network development plan.
However, ENTSO-E's pilot Ten Year Network Development Plan(TYNDP) does not include an adequate assessment of the infrastructure needed to connect upcoming new offshore wind capacities.
The Council has changed this into a non-binding indicative network development plan.
The competent national authorities shall examine the consistency of the ten-year network development plan with the national energy and climate plan submitted in accordance with Regulation(EU) 2018/1999.
For electricity and gas,proposed projects should be part of the latest available ten-year network development plan.
If any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult ACER.
Provisions strengthening of the role of the agency in the process of establishing a 10-year network development plan.
B Indicate how the infrastructure projects take into account the Union-wide 10-year network development plan elaborated by ENTSO for Gas pursuant to Article 8(10) of Regulation(EC) No 715/2009.
Notes the ACER's responsibility to ensure that national programming of electricity grid development corresponds to the 10-year Network Development Plan;
The candidate operator has committed to complying with a ten year network development plan proposed by the regulatory authority;
The distribution system operator shall consult all relevant system users andthe relevant transmission system operators on the network development plan.
The new Internal Energy Market package envisages the establishment of a regular 10-year Network Development Plan outlining missing links and the action necessary to complete them.
The network development plan shall also demonstrate the use of demand response, energy efficiency, energy storage facilities or other resources that distribution system operator is using as an alternative to system expansion.
The regulatory authority shall consult all actual orpotential system users on the ten-year network development plan in an open and transparent manner.
Stresses that the Ten-Year Network Development Plan(to integrate the EU's electricity and gas grid networks) should be brought more closely into line with the 2020 targets and then implemented as a methodological and technological basis for new legislation in the area of energy infrastructure;
(a) Market integration, competition and system flexibility shall be measured in line with the analysis made in the latest available ten-year network development plan in electricity, notably by.
In line with the methods applied for the elaboration of the latest available ten-year network development plan in electricity, it shall in addition notably take into account the impacts of the project on the following.
The Preventive Action Plan, in particular the actions to meet the infrastructure standardas laid down in Article 6, shall be based on and consistent with the ten year network development plan to be elaborated by the ENTSO-G13.
The idea is that the European Networks of transmission system operators will publish network development plans, to include the integrated network modelling, scenario development and an assessment of the resilience and deliverability of the integrated system.
The Commission could however support the Agency's adopting a non-binding investment plan, orplaying a role in monitoring consistency between the national investment plans as approved by the national regulators and the 10-year network development plan of ENTSO.
The distribution system operator shall publish the results of the consultation process along with the network development plan, and submit the results of the consultation and the network development plan to the regulatory authority.
The network development plan shall contain the planned investments for the next five to ten years, with particular emphasis on the main distribution infrastructure which is required in order to connect new generation capacity and new loads including re-charging points for electric vehicles.
The preventive action plan, in particular the actions to meet the infrastructure standard as laid down in Article 4,shall take into account the Union-wide 10-year network development plan to be elaborated by the ENTSO for Gas pursuant to Article 8(10) of Regulation(EC) No 715/2009.
The network development plan shall provide transparency on the medium and long-term flexibility services needed, and shall set out the planned investments for the next five- to- ten years, with particular emphasis on the main distribution infrastructure which is required in order to connect new generation capacity and new loads, including recharging points for electric vehicles.
Reviewing investment plans of the transmission system operators, and providing in its annual report an assessment of the investment plan of the transmission system operators as regards its consistency with the European-wide 10-year network development plan mentioned in Article 2c of Regulation(EC) No 1775/2005;
The Commission will also closely work with the European Network of Transmission System Operators for Electricity(ENTSO-E)to make sure that the Ten-Year Network Development Plan(TYNDP), which constitutes the sole instrument for the selection of Projects of Common Interest(PCIs), widens its scope and clearly identifies projects to achieve the 10% interconnection target while proposing concrete action, including the possibility to complement the TYNDP if need be.