Examples of using Network development plan in English and their translations into Slovak
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
The regulatory authority shall review the draft ten-year network development plan and approve it.
That network development plan shall contain efficient measures in order to guarantee the adequacy of the system and the security of supply.
Under the common position, ENTSO adopts an indicative 10-year network development plan.
That network development plan shall contain efficient measures in order to guarantee the adequacy of the system and the security of supply.
The transmission system operator shall publish the ten-year network development plan on its website.
People also translate
The first 10-year network development plan(TYNDP) 19 forms a solid basis to identify priorities in the electricity infrastructure sector.
Provisions strengthening of the role of the agency in the process of establishing a 10-year network development plan, and.
If any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult the Agency.
Before its approval,it may require the transmission system operator to amend its ten-year network development plan.
If any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult ACER.
For electricity and gas,proposed projects should be part of the latest available ten-year network development plan.
Adopt and publish a non-binding Union-wide ten-year network development plan,(‘Union-wide network development plan'), biennially;
For electricity and gas, in order to be eligible for inclusion in the second and subsequent Union lists,projects should be part of the latest available 10-year network development plan.
About half of the projects in the European network operators' 2010 network development plan have been considered as delayed in 2012.
In developing the network development plan, the distribution system operator shall involve, including through consultation, all current or potential system users.
Notes the ACER's responsibility to ensure that national programming ofelectricity grid development corresponds to the 10-year Network Development Plan;
ACER shall provide an opinion on the nationalten-year network development plans to assess their consistency with the Union- wide network development plan.
Market integration, competition and system flexibilityshall be measured in line with the analysis made in the latest available Union-wide 10-year network development plan in electricity, notably by.
The 10-year network development plan drawn up by the ENTSO-G and supervised by ACER is a fundamental tool to identify the required investments needed at Community level.
In line with the methodsapplied for the elaboration of the latest available ten-year network development plan in electricity, it shall in addition notably take into account the impacts of the project on the following.
The network development plan shall also demonstrate the use of demand response, energy efficiency, energy storage facilities or other resources that distribution system operator is using as an alternative to system expansion.
The distribution system operator shall publish the results of the consultation process along with the network development plan, and submit the results of the consultation and the network development plan to the regulatory authority.
The network development plan shall contain the planned investments for the next five to ten years, with particular emphasis on the main distribution infrastructure which is required in order to connect new generation capacity and new loads including re-charging points for electric vehicles.
At least every two years,transmission system operators shall submit to the regulatory authority a ten-year network development plan based on existing and forecast supply and demand after having consulted all the relevant stakeholders.
When elaborating the ten-year network development plan, the transmission system operator shall make reasonable assumptions about the evolution of the generation, supply, consumption and exchanges with other countries, taking into account investment plans for regional and Community-wide networks. .
The ENTSO for Electricity shall submit the draft Union-wide network development plan, the draft annual work programme, including the information regarding the consultation process, and the other documents referred to in Article 30(1) to ACER for its opinion.
However, ENTSO-E's pilot Ten Year Network Development Plan(TYNDP) does not include an adequate assessment of the infrastructure needed to connect upcoming new offshore wind capacities.