Examples of using Previous layer in English and their translations into Romanian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
Each previous layer must also be completely dry.
It is necessary to wait for every time so far the previous layer will dry.
Foam from the previous layer should soften the drop of the jet, preventing further mixing process.
Application of plaster layers with mandatory drying of the previous layer.
Repeat circular turns on the top and bottom of the previous layer several times, gradually closing the entire injured place;
When using water-based paints do not haveneed for drying with previous layers.
When painting, one doesn't want to trap dust, dirt,or bubbles in a previous layer of paint, or other imperfections under the new layer. .
Concrete dry for a week or more,so to each subsequent stage can begin only waiting for the drying of the previous layer.
I apply this mascara is usually in two layers, well layers, the previous layer does not remove and does not clump.
During the painting- do not be lazy to screw the cap on in between coats of varnish,if you are waiting for drying of the previous layer.
A week later,the procedure of applying varnish is repeated, but the previous layer of varnish is removed with a swab.
It is mandatory that the previous layer- level Q2 is finished and dry(takes no more than 24 hours) and all joints are smoothed and filled.
The next layer must be vibrated before the previous layer has hardened.
It is mandatory that the previous layer- level Q2 is finished and dry(takes no more than 24 hours) and all joints are smoothed and filled so that they are not see through.
The final third layer of plaster is applied after 15 minutes,when the previous layer dries.
This newer stone foundation of the fortress was built on previous layers of older foundation(dating to the ninth or tenth centuries) made of wood, mud and clay(Motte and Bailey type).
It must be thoroughly cleaned, not only from dirt,but also from previous layers of finishing materials.
Do three such vertical turns, after which the bandage from under the right ear is carried to the front of the neck, obliquely across the back of the head and around the head,thus fixing the previous layers.
Cement-lime mortar for finishing must contain more lime than the previous layers, to improve the plasticity of the mixture.
Stroke 2- bandage bypass the shoulder in front, on the outside, behind, through the armpit and lift it obliquely over the shoulder,so as to cross the previous layer;
The prepared composition should be applied to the skin in several stages, as the previous layer dries up, the following layer should be applied.
Stroke 3- make a turn through the back on the right forearm across, from where the bandage is re-drawn along the chest in the direction of the left axillary cavity,while crossing the previous layer;
Apply should be a dense layer, preferably in several approaches as the previous layer dries up, and wait for complete drying.
Then, the worktable descends the height of the sheet, the solidified resin sheet is covered with a layer of new liquid resin, so that the second layer of the laser scan is cured, andthe newly solidified layer is firmly bonded to the previous layer.
Then take the next strip, create the same"loop",partially overlap it on the previous layer(so that the base does not look through) and also attach.
But there must be a time between them, during which the complete drying of each previous layer will take place.
Waterproofing should be applied in two layers with an interval for drying the previous layer about 4 hours. Materials intended for waterproofing.
The main layer of varnish is applied in several layers after the previous layer has dried completely.
As an exception, the mixture can be applied to components other than those contained in the previous layer, only provided that the basis of the composition will more durable.
If the product is applied in several layers, then it is necessary to wait until the previous layer is completely dry.