Examples of using Acceptance tests in English and their translations into Russian
{-}
-
Official
-
Colloquial
Acceptance tests of TVS-KVADRAT were carried out;
Each sign is subjected to acceptance tests.
Acceptance tests in STC OJC«KAMAZ» is being conducted;
Technical requirements for instrumentation and acceptance tests.
Acceptance tests have confirmed that http://online.
Then came the cutover process and user acceptance tests.
Successful acceptance tests of SMES system at IBIS Hotel.
For the production process:quality control in production and acceptance tests;
Successful acceptance tests of SMES at Thermal Electric Power Station.
Certification tests can be combined with acceptance tests.
Acceptance tests according to methods agreed with client.
Shipments were carried out in November 2006 after lot acceptance tests.
Acceptance tests are performed in the presence of the Customer.
The Supplier shall bear all costs for acceptance tests carried out at the place of manufacture.
We will design and test your product andtake care of its qualification and acceptance tests.
The Agency also performed acceptance tests of 658 portable radiation detection instruments.
One type of functional tests is acceptance testing or acceptance tests.
Include in the acceptance tests criteria for monitoring the incidence of ERW from the munition.
Glaston's lead engineer who took care of the commissioning and acceptance tests was very knowledgeable," he continues.
Acceptance tests should be written using the standard agile framework of a user story:"As a I want so that.
In New Year's Eve tools were dispatched to the customers,whose representatives participated in the acceptance tests.
Acceptance tests of two experimental fuel assemblies IRT-3M with low-enriched uranium-molybdenum fuel for research reactors;
I am representing our company experience of implementing Gherkin Language syntax for creating user story acceptance tests.
Acceptance tests provided for in the Contract shall, unless otherwise agreed, be carried out at the place of manufacture during normal working hours.
It was installed in August 2011 when the startup operations and acceptance tests started.
Final acceptance tests will commence only after all functional and performance tests have been satisfactorily completed.
Software testing outsourcing companies run acceptance tests after functional, regression and system types of testing.
The acceptance tests showed that the accumulative data speed at certain points reaches 40 Mb/s with a system able to stand 150% traffic load rise.
The laboratory staff has many years of experience in performing acceptance tests required by Italian and foreign network operators, among these Telecom Italy and Vodafone.
Diagnostic PD measurements are recommended after conspicuous measured values, such as increased gas-in-oil values orafter a failed PD measurement during acceptance tests.