Examples of using Test stations in English and their translations into Russian
{-}
-
Official
-
Colloquial
Test stations officially designated by the.
Technical requirements for the test stations.
Test stations- accreditation/test methods.
Denmark can only use foreign test stations.
Test stations officially designated by the.
This item should be discussed initially by the Sub-Commission on Test Stations.
All test stations with clamping devices feature identical designs.
Complex high speed in-production test stations including.
Test stations shall be equipped with instruments to measure the U value to an accuracy of+- 5.
There are no additional requirements for ATP test stations or experts.
Test stations officially designated by the competent authorities of countries Parties to ATP.
The Russian Federation does not at present have any officially recognized test stations.
Slovak Republic has not got its own test stations for railway and for road transport too.
This may lead to different test results being obtained at the test stations.
Test stations shall be equipped with instruments to measure the U value to an accuracy of+- 5.
The secretariat received a letter from Greece regarding new addresses of two Greek ATP Test Stations.
Technical requirements for the"Test Stations": The Test Stations will comply with the standard ISO-17.025.
The current proposal is the result of common work between members of Transfrigoroute International and ATP test stations.
However, several test stations did not agree with the application of a new certification rule to this type of equipment.
This may lead to different interpretations by the competent authorities and divergences between test stations.
The test stations referred to in annex 1, appendix 1, were not necessarily those of a Country party to ATP.
The Working Party will be informed about the major results of ATP Test Stations Meeting held in Cesena(Italy), 12-13 May 1997.
Sub-Commission D2 CERTE on Test Stations(Refrigerated Transport) of the International Institute of Refrigeration, which met in June 2009 in Castelo Branco, Portugal.
The Working Party expressed the hope that the next meeting on test stations would bring progress towards a solution.
Test stations and pilot plants for wind and solar energy should be built as international joint ventures with the assistance of relevant international organizations.
Votes on technical items should be taken in the standards committees together with the ATP test stations and the industry involved.
In the absence of a test procedure, manufacturers and test stations worked together between 1994 and 1998 to design a protocol for testing such appliances.
The proposal would ensure that measurements made on panel vans are consistent between different experts and test stations, avoiding unrealistic test results.
The pneumatic system, which automatically lowers all three test stations at the beginning of the test and raise them at the end of the test, eliminates the need for operator manual handling.
The Working Party will be informed about the major results of the ATP Test Stations Meeting held in Hamburg(Germany), 6-7 June 2002.