Examples of using Construction should in English and their translations into Serbian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Latin
-
Cyrillic
Construction should start soon.
If all goes as planned, construction should begin by the year's end.
Construction should begin soon.
For better temperature reduction construction should be carefully calculated and analyzed.
Construction should commence soon.
Walsh's Pyramid in Australia- Construction Should Be More Than 5 000 Years Old!
Construction should begin in 2016.
It will follow that program construction should be encouraged in some other way.
Foster is also building the head office for the Russian Copper Company, and construction should be finished by 2019.
Glass construction should be safe.
But some native Hawaiians insist the site is sacred and that the long-planned construction should not go ahead.
Construction should take about 16 months.
She has added that this would be the sixth highway which construction should commence in this and the following year.
Construction should be 16 months.
When the temperature is too low, the construction should not be carried out in windy and sleet weather above grade 4.
Construction should begin this summer.
Local companies will realize 49% of the project, and the construction should start in 2019, so that heating with the energy from TENT A would be possible in two to three years.
Construction should begin by the end of the month.
Local companies will realize 49% of the project, and the construction should start in 2019, so that heating with the energy from TENT A would be possible in two to three years.
Construction should be finished next year.
The project was made to build a new facility closed within the existing complex of the Prison, whose construction should begin in early 2017, with a capacity for about 500 persons.
The construction should be finished within 15.
Value of investment is estimated to 20 billion EUR, andpipeline capacity should be 63 billion cubic meters a year, construction should begin in 2011 and deadline for end of work is the end of 2015.
Construction should be completed next year.
The spatial Plan was adopted and the Final Arrangement was made with European Investment bank on financing the first section of the highway Nis- Merdare- Pris tina(which would connect Corridor 10 with Adriatic through Drac), and whose construction should begin in 2018.
I think that this construction should protect the building nicely.
Construction should begin by the end of March, early April.
If all goes well, construction should start by the end of the year.
The construction should not interfere with the movement of residents and not be dangerous for them.