Examples of using Type a value in English and their translations into Slovenian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Financial
-
Computer
-
Official/political
-
Programming
Then type a value in the next cell to establish a pattern.
Let the user either choose an item from a pop-up menu or type a value.
Type a value in the box between the lists to specify the time period.
Primary key field: The user will be able to type a value in the field when adding records however;
Press the Up or Down arrow key until you hear the value you want, or type a value.
In the next row, type a value or percentage change from the previous rate in the Standard Rate column.
This makes it easier for users toquickly find existing records without having to type a value into the Find dialog box.
In the next row, type a value or percentage change from the previous rate in the Standard Rate column.
Click a property from the Pick Property list,choose a logical operator, and type a value that you want to search for.
In the next row, type a value or percentage change from the previous cost in the Per Use Cost column.
In the Antivirus Threads section, in the Number of threads box, type a value for the number of threads that the virus scanner can use.
If you type a value in the% Work Complete field, Project automatically calculates actual work and remaining work.
In the Define Custom Filter dialog box, select a field in the Field Name list and a test in the Test list,and then type a value to test for in the Value box.
In the Cost section, type a value(without a currency symbol) that represents the financial impact of the risk.
Attempt to clean infected documents In the Antivirus Time Out section, in the Time out duration(in seconds)box, type a value for how long to wait for the virus scanner before timing-out.
If you type a value in the% Complete field, Project automatically calculates actual duration and remaining duration.
Note: When sortingdata for a field that is of the Yes/No data type, a value of"Yes","True" or"On" is considered"Selected", and a value of"No","False" or"Off" is considered"Cleared".
If you type a value in the Remaining Duration field, Microsoft Office Project calculates a new duration and completion percentage.
To enter a series of data, such as days, months, or progressive numbers, type the starting value in a cell,and then in the next cell type a value to establish a pattern.
In the Impact section, type a value between 1 and 10 that represents the severity of the impact, with 10 being the highest severity.
Under Angle of first slice box,drag the slider to the degree of rotation that you want, or type a value between 0(zero) and 360 to specify the angle at which you want the first slice to appear.
In the Storage Limit Values section, to limit the maximum amount of storage available on a site,select the Limit site storage to a maximum of check box and type a value for the limit in megabytes(MB) in the corresponding box.
In the Angle of first slice box, type a value between 0(zero) and 360 to specify the angle at which you want the first slice to appear.
(Optional) In the Context Key box, type a value that will be used to connect the Help document or folder to an entry point in the product.
You can either accept the default value or override it by typing a value.
The larger value means SR,that viewers need to perform a new search, by typing a value SR 29700.
In the example shown below for a row, typing a value in cell A4 expands the table to include that cell in the table along with the adjacent cell in column B.
When a the user begins typing a value into a Managed Metadata field, it displays all terms in the associated term set that begin with the characters the user has typed. .