Examples of using Calculations are based in English and their translations into Swedish
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
-
Political
Calculations are based on a 24 hour week.
But they can't come up with a functioning equation because the calculations are based on 99 of these guys.
These calculations are based on a fixed duration.
Measures that reduce electricity consumption should be performed, therefore, the calculations are based on a lower consumption than the current one.
Cost calculations are based on the following assumptions.
Percentage calculations are based on monthly payments.
Calculations are based on the cruising speed situation.
These calculations are based on a fixed task duration.
Calculations are based on the IEC 60287
These calculations are based on a fixed task duration.
Calculations are based on the most recent version of the PRIMES Reference Scenario.
Because the calculations are based on 99 of these guys. but they can't come up with a functioning equation.
The calculations are based on the number of FTEs.
Our calculations are based on the academic research and case studies.
Its calculations are based on a thouroughly tested
The calculations are based on equations described in standard EN ISO 12241.
These calculations are based on the production function method approved by the Council.
The calculations are based on statistics regarding diesel,
OEE calculations are based on three factors: Availability,
The calculations are based on typical deployment scenarios using manual headset deployment vs.
Our calculations are based on valid data from banks
These calculations are based on a Cobb-Douglas production function with a constant returns to scale.
The calculations are based on grease savings and do not include the 37% reduction in frictional losses.
Furthermore, the calculations are based on a brighter economic trend than other forecasters' estimates.
The calculations are based on the requirements and general guidelines contained in the Swedish construction regulations BBR 2008, chapter 9.
The calculations are based on all listeners having up to thirty radio channels with national coverage at their disposal.
You know that the calculations are based on average values and guesses at lead times,
The calculations are based on assumptions that all available shares in the LTI 2015 will be utilized.
The calculations are based on established factors for calculating carbon dioxide equivalents,
The calculations are based on the assumption that the shares made available under the terms of PSP 2014 will be fully subscribed.