Examples of using Pre-project in English and their translations into Swedish
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
-
Political
Pre-project was divided into of three tasks.
Erik comes from a position as process manager in pre-project Aurora.
SCA is conducting a pre-project to assess the possible expansion of kraftliner.
Project Helios was conducted during 2015-2018, a pre-project started in 2014.
Four pre-project compared with each other,
A total of 10 projects were initiated in the form of pre-studies or pre-projects.
A pre-project to an intranet project is an important step that can be done in a various scale.
If you want we're able to deliver pre-project workshops before you decide on the big plan.
The Construction Industry Institute is a process-industry consortium with information and training on pre-project planning.
COWI has conducted a pre-project and detailed project planning of measures to close Grønmo landfill site.
was developed during pre-project academic exchanges.
I have an idea of association(at the pre-project stage) and would like to find people interested in helping me on my project.
The result was presented in the summer of 2014 and was so compelling that an immediate decision was made to invest SEK 44 million in a pre-project.
technical pre-project and development, with impact assessments in several areas, including.
the Topic Centres based on the findings of a pre-project 2000-2001.
COWI and its partners in Team_T3 planned the pre-project and detailed project for the new terminal and changes to the existing terminal.
then go to the store Energy Broker- there you will be able to make a pre-project survey, based on which you have a particular model selected.
The pre-project goals were to develop a method to allow the incorporation of probabilistic fatigue constraints related to casting defects directly in topology optimisation
needs to be addressed, but it may be equally important to settle requirements and pre-projects, or other areas that can be identified as the root of the problem.
Should both pre-projects materialise it would imply an overall efficient production structure for the group,
segregation of duties, pre-project approval and pre-payment checks,