Examples of using Pre-assembly in English and their translations into Thai
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Delivery Condition: Pre-assembly.
Pre-assembly with T-bolt and washer supplementary service.
Inspection and Pre-Assembly Services.
Pre-assembly structure for ship and can be used at once.
Pre-assembled structure and pre-assembly packaging.
Use the pre-assembly structure for ships, fully with locks.
Pre-assembled structure and pre-assembly packaging.
Maximized pre-assembly, great savings on labor and cost;
Pre-assembled structure and pre-assembly packaging.
Pre-assembly of all components in the sleeper factory possible.
Rail-free design, and pre-assembly for best costs.
Pre-assembly structure for ship with the clear installation guide documents.
Rail-free design and pre-assembly save the costs to a great extent;
Pre-assembly mount system with professional design enables to save your time and money on site.
Easy installation, maximized pre-assembly, great savings on labor and cost.
Maximum pre-assembly, which greatly saves labor and cost and provides convenience to customers as much as possible.
Electronic& pneumatic parts: Do pre-assembly to make sure everything is in order.
The Adjustable tilt flat roof mounting system will easily fit different flat roof or open terrain applications, due to its variable tilt angle and footing options for both roof clamp and roof penetration. Elevation can be used as fixed tilt or adjustable tilt, allow project-specific adjustments and optimize solar power output. The innovative design and high pre-assembly eliminate the need for on-site cutting, welding and enables quick and easy PV module installation.
Maximized pre-assembly, great savings on labor and cost.
SunRack Flat roof solar mounting series are widely applied in residential, commercial and utility solar systems. With unique design and pre-assembly accessories, SunRack flat roof solar mountings will save a lot of time on installation and save a lot of space on transportation. It can not only used on flat roof, but also apply to ground solar system installation.
Improve the pre-assembly degree of boiler components, facilitate and reduce the installation workload.
Structure is highly pre-assembly in factory to save the installing time and labor cost.
Maximized pre-assembly, great savings on labor and cost. the structures of rails and girders are the same.
The innovative design and high pre-assembly eliminate the need for on-site cutting, welding and enables quick and easy field PV module installation.