Examples of using Lean construction in English and their translations into Vietnamese
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
What is Lean Construction.
Lean construction is a"way to design production systems to minimize waste of materials, time and efforts in order to generate the maximum possible value".
The past few years he has been very active in Lean Construction Institute Finland community.
Lean Construction has been defined as:“A way to design production systems to minimise waste of materials, time and effort in order to generate the maximum possible amount of value.”.
Lean Construction is“a way of designing production systems in such a way that material, time, and workload are minimized to generate the greatest possible value”(Koskela et al, 2002).
Lean construction is a“way to design production systems to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value,”(Koskela et al. 2002).
Lean accounting[7] has developed in recent years to provide the accounting, control, and measurement methods supporting lean manufacturing and other applications of lean thinking such as healthcare, construction, insurance, banking, education, government, and other industries.
The river is chiefly known from the Pierre Boulle novel andDavid Lean film The Bridge on the River Kwai, in which Australian, Dutch and British prisoners of war were forced by the Japanese to construct two parallel bridges spanning the river as part of the Burma Railway, also called the Railway of Death, for the many lives lost in its construction.
Construction began in 1173 and the tower started leaning soon afterwards due to subsidence of the ground underneath its base.
The industry is leaning mainly on processing industry and(including construction) accounted for 29.32% of GDP in 2008.
The foundation for the tower was built on ground that was too soft to support its weight,and it started to lean during construction.
This book's case studies andexamples hold value for readers who want to tackle the construction of a Lean enterprise, but don't know where to start.
Most famous for its tilt, the tower began to lean during construction after soft ground on one side was unable to properly support the structure's weight.
Pisa's Campo dei Miracoli is home to the Duomo, Baptistery, Campo Santo, and the famous Leaning Tower,which took over 177 years to build and has been leaning since construction began in 1173.
FAMOUS has been engaged in construction of scientific and efficient modern enterprise management system, continuous improvement of corporate operation system and management mechanism and steady up-grading of lean management level.
When construction resumed, chief engineer Giovanni di Simone tried to compensate for the lean by adding extra masonry to the short side, but the additional weight caused the structure to tilt even further.
The construction of a campanile, which would eventually become the Leaning Tower of Pisa, began.
The man, a construction worker in the West Bank settlement of Beitar Illit, near Jerusalem, posted a picture of himself leaning against a bulldozer with the caption“يصبحهم”, or“yusbihuhum”, which translates as“good morning”.
To Israeli news agencies, The man, a construction worker in the West Bank settlement of Beitar Illit, near Jerusalem, posted a picture of himself leaning against a bulldozer with the caption“yusbihuhum”, which translates as“good morning”.
The Leaning Tower of Pisa is not straight/tilted because at the time of its construction, the foundation of this tower was only 3 meters deep and even that foundation was built on a dense clay mixture of soil that, as it turned out, couldn't support and hold the weight of the mammoth tower.