What is the translation of " BASE DE PLANIFICATION " in English?

planning basis
fondements de la planification
bases de la planification

Examples of using Base de planification in French and their translations into English

{-}
  • Official category close
  • Colloquial category close
Processus comme base de planification.
Processes as the basis for planning.
Base de planification pour la maintenance préventive.
Basis for planning preventive maintenance.
On peut l'utiliser comme base de planification.
We can then use this as a basis for planning.
Base de planification uniforme pour tous les corps de métier et prestataires de services.
Uniform basis for planning for all projects and service providers.
Conception d'une feuille de route réaliste comme base de planification.
Creating a realistic roadmap as a basis for planning.
Ces principes forment la base de planification pour tous les autres travaux.
These principles form the planning basis for all further work.
Pour les petits halls,la simulation est souvent suffisante comme base de planification.
In small warehouses,the simulation is often sufficient as the basis for planning.
FACADE comme base de planification de bâtiments durables et orientés vers le futur.
FACADE Timber-Glass-Composites as the basis for planning forward-looking, sustainable building.
Un rapport détaillé peut être généré comme base de planification pour la procédure peropératoire.
As a planning basis for intra-operative procedure, a detailed report can be generated.
Base de planification en trois dimensions lors du montage de nouvelles machines ou installations.
Three-dimensional basis for planning for the assembly of new machines and/or systems.
O Télédétection et création d'une base de planification et de surveillance de l'utilisation des terres.
O Remote sensing to create the basis for planning and monitoring land use;
Mon dernier développement concerne le changement climatique et les catastrophes,ainsi que l'amélioration de la base de planification.
My final point is on climate change anddisasters and improving the basis for planning.
Base de données complète et uniforme servant de base de planification pour tous les corps de métier.
A uniform and comprehensive basis of data serves as the basis for planning for all projects.
Tous ont commencé à établir des diagnostics,très souvent dans l'optique des PAN, comme base de planification.
All the countries began by preparing diagnostic studies,in many cases with a view to NAP formulation, as a basis for planning.
Cela comprendra un résumé de la base de planification, de leur mode de fonctionnement,de la capacité estimée, des échéanciers et des coûts.
This will include a summary of the planning basis, their mode of operation, estimated capacity, timelines and costs.
A la fin d'une année de formation, les résultats sont utilisés comme base de planification de mesures supplémentaires.
At the end of the educational year the results are used as a basis for planning further measures.
Ainsi qu'il l'a été dit lors d'une des réunions régionales, comme le modèle a subi plus d'une modification au cours des années,il se peut que certains pays répugnent à l'utiliser comme base de planification.
As stated at one of the regional meetings, because the format has changed quite a bit over the years,countries may be reluctant to use it as a basis for planning.
Cette base de planification spécifique aux groupes cibles a permis à Gerry Weber d'élaborer un scénario d'éclairage adapté à la marque et au concept de magasin et de relever d'avantage de réactions émotionnelles des clientes en opposant le concept d'éclairage existant et sa nouvelle version.
This target group-specific planning basis made it possible to design a lighting scenario tailored towards the Gerry Weber brand and shop concept, and to measure the customers' emotional reactions from the existing design versus the new lighting design.
Cette estimation ne remplace pas un calcul correct, spécifique statique et calcul, maisdoit servir tout simplement comme la base de planification.
This evaluation does not substitute for a correct, specific static calculation andfor calculation, but should serve merely as a planning basis.
E-DOCS 4176154-v1.0 Plan d'intervention en cas d'urgence nucléaire de la CCSN(Plan directeur du PIUN)jul. 2013 2.0 Base de planification En cas d'urgence nucléaire à une installation autorisée ou impliquant des substances nucléaires autorisées par la CCSN, le principal intervenant est le titulaire de permis.
E-DOCS 3845178-v24 CNSC Nuclear Emergency Response Plan(NERP Master Plan)May 2013 2.0 Planning Basis In the event of a nuclear emergency at a licensed facility and/or involving CNSC-licensed nuclear substances, the main responder is the licensee.
Les projets de vérification sont souvent répétés,augmentés pour traiter de domaines supplémentaires ou utilisés comme base de planification d'autres missions.
Audit projects are often repeated,extended to cover additional areas or used as a basis for planning other assignments.
La base de planification décrit la nature des risques liés aux urgences nucléaires, le type d'événements visés par le PFUN, les principes pertinents pour planifier et préparer l'intervention advenant de tels événements, et le rôle des organisations fédérales pour faire face aux événements et atteindre les objectifs d'intervention.
The planning basis describes the nature of the hazards associated with nuclear emergencies, the types of events for which the FNEP applies, the principles that are relevant in planning and preparing to respond to such events, and the role of federal organizations in responding to these events and in achieving the response goals.
Etant donné que les chiffres qui ont été fournis sont approximatifs et souvent contradictoires,ils ne peuvent certainement pas être utilisés comme base de planification.
Given that the figures that had been provided were approximate andoften contradictory, it was surely impossible to use them as a basis for planning.
Avantages: aménagement personnalisé de la surface par carrelage, enduit et crépi;montage simple et rapide; base de planification et de calcul simple; pas de découpe.
Benefits: tiles, plaster or filler can be used to create an individual surface finish; quick andeasy to assemble; simple basis for planning and calculation with no cutting waste.
Les autorités appropriées hors site établissent le rayon de cette zone(habituellement entre 50 et 80 km)en fonction de l'information contenue dans la base de planification.
Appropriate offsite authorities determine the size of the ingestion control planning zone(typically in the range of 50 to 80 km)based on information in the planning basis.
Nous voulons tous conjointement avec les équipes et l'UCI structurer l'avenir du sport cycliste etaussi contribuer à ce que les équipes aient une base de planification et de survie durable..
We all want to work with the teams and the UCI to shape the future of cycling andalso to help the teams to have a long-term basis for planning and survival.
Les membres du Conseil examinent les hypothèses économiques sous- jacentes au Budget etaux perspectives économiques de l'Ontario afin d'évaluer le caractère raisonnable des prévisions comme base de planification.
Council members review the economic assumptions underlying the Budget andthe Ontario Economic Outlook to assess the reasonableness of the forecast as a basis for planning.
Parallèlement, la Thaïlande a incorporé la notion de faible intensité de carbone et la philosophie de l'économie de suffisance dans son onzième plan quinquennal, l'Inde a pris en compte les valeurs écologiques dans sa comptabilité nationale etle Bhoutan a utilisé les mesures du bonheur national brut comme base de planification.
Meanwhile, Thailand has integrated low carbon concepts and the philosophy of"sufficiency economy" into its eleventh five-year plan, India is incorporating ecological values into national accounts andBhutan has used Gross National Happiness measures as a basis for planning.
La Thaïlande a incorporé les notions de basses émissions de carbone et la philosophie de <<l'économie de suffisance>> dans son onzième plan quinquennal, tandis que l'Inde a incorporé les valeurs écologiques dans sa comptabilité nationale et quele Bhoutan utilise les mesures du bonheur national brut comme base de planification.
Thailand has integrated low carbon concepts and the philosophy of"sufficiency economy" into its Eleventh Five-year Plan, while India has incorporated ecological values into national accounts andBhutan is using gross national happiness measures as a basis for planning.
Results: 29, Time: 0.0448

How to use "base de planification" in a French sentence

Jusqu'à -30% dans les recrutements, ceci sans véritable base de planification pluriannuelle.
Le couplage PIC/PDP permet de développer une base de planification de la production.
Cette formation va au-delà des pratiques de base de planification et de suivi d’itération.
Des mensualités fixes pendant la durée du contrat assurent une base de planification sûre.
Le projet «come west» se veut l’interprétation contemporaine de la base de planification de Brünnen.
Ce document est destiné à servir de base de planification aux cantons et aux communes.
Base de planification expérimentale utilisée en analyse sensorielle, aspects pratiques du déroulement d’une séance d’analyse, données récoltées
Tous les projets et principalement les plus larges, nécessitent une bonne base de planification pour assurer leur succès.
Application Excel Base de planification pour les cantons en vue d'une pandémie de grippe (PDF, 249 kB, 09.11.2016)
Acquérir les principes de base de planification fiscale, proposer des moyens permettant de réduire l’impôt sur le revenu.

How to use "planning basis, basis for planning" in an English sentence

Therefore, 3D data is an ideal planning basis for structural measures.
These then serve as the basis for planning a project.
Creation of planning basis for the development of the functional systems on the territory in accordance with the adopted in the MP guidelines in this field.
Process Simulator is the basis for planning innovative operations.
This will provide a basis for planning your journey.
These documents are the basis for planning for nontraditional families.
It assists with investment decisions and provide a basis for planning and implementation.
This view provides a basis for planning the technical content of iterations.
This corresponds to forty five% waste oxide loading but in addition represents a 5,000 m3 reduction over the planning basis of 14,000 m3.
This statute provided the legal and planning basis for the North Ranch Master Plan.
Show more

Word-for-word translation

Top dictionary queries

French - English